Wooster, Ohio: water and wastewater capital improvement projects

57 line items · $39M · starting 2026–2031 · 1 plan

Wooster's published capital plans list 57 water, sewer and wastewater line items with a combined planning budget of $39M, of which 29 items worth $21M sit in the wastewater and sewer departments. The largest single item is WRRF Biosolids & Biogas System Upgrades (Phase 3: Biosolids Dewatering & Disposal) at $4M (2026–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Wooster

The 10 largest water, sewer and wastewater line items in Wooster’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1WRRF Biosolids & Biogas System Upgrades (Phase 3: Biosolids Dewatering & Disposal)SewerAnaerobic digesters and biogas$4M2026–2027
2Water Treatment Plant Equipment ReplacementsWater SupplyWater treatment plants$3M2026–2033
3WRRF Biosolids & Biogas System Upgrades (Phase 2: BioGas Conditioning & CHP Generator)SewerAnaerobic digesters and biogas$3M2025
4Waterline ReplacementsWater DistributionWater mains and distribution$2M2024–2033
5Melrose to Daisy Sanitary Sewer ReplacementSewerSewer rehabilitation and I&I$2M2025
6Sanitary Sewer Lining ProjectsSewerSewer rehabilitation and I&I$2M2026–2032
7750,000 Gallon WTP Clearwell AdditionWater SupplyWater treatment plants$2M2031
8Sanitary Sewer Misc.SewerSewer rehabilitation and I&I$1M2024–2032
9I&I Reduction ProgramSewerSewer rehabilitation and I&I$1M2025–2032
10Gasche Street W/L ReplacementWater DistributionWater mains and distribution$1M2025

47 more line items in Wooster, with descriptions and contacts

Klarifi holds every Wooster line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$18M

19 items

2026

$11M

11 items

2027

$535K

5 items

2028

$2M

6 items

2029

$385K

2 items

2030

$800K

4 items

2031

$4M

7 items

2032 and later

$1M

3 items

By department

Line items and planning budgets by department, Wooster.
DepartmentLine itemsBudgetShare
Wastewater3$375K1%
Sewer26$20M52%
Water Supply10$8M21%
Water Distribution18$10M26%

Project types in Wooster's plan

Wastewater treatment plants in Wooster

3 publicly owned treatment plants in Wooster with 42 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Wooster Renewable Energy4.42OH002818524
Wayne Co Eastwood Subdivision STP0.04OH003656113
Gingery Allotment STP0.0028OH00365795

Other Ohio cities with capital plans

Wooster capital plan questions

Sources and methodology

Budgets and years are as published in Wooster’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2030 (57 line items).

Data refreshed September 11, 2026.