46 line items · $20M · starting 2026–2027 · 1 plan
Findlay's published capital plans list 46 water, sewer and wastewater line items with a combined planning budget of $20M, of which 28 items worth $14M sit in the wastewater and sewer departments. The largest single item is Spring Lake Sanitary Upgrade at $3M (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Spring Lake Sanitary Upgrade | Sewer | Sewer rehabilitation and I&I | $3M | 2025 |
| 2 | 2025 Annual Sewer & Manhole Lining Program | Sewer | Sewer rehabilitation and I&I | $3M | 2025–2035 |
| 3 | 2025 Annual Sewer Cleaning (Large Diameter) | Sewer | Sewer rehabilitation and I&I | $2M | 2025–2035 |
| 4 | Water Masterplan | Water Supply | Water treatment plants | $1M | 2025 |
| 5 | Morrical Waterline Replacement Phase II | Water Distribution | Water mains and distribution | $1M | 2025 |
| 6 | Washington Avenue Storm Sewer Upgrades Phase II | Sewer | Sewer rehabilitation and I&I | $850K | 2025–2026 |
| 7 | Generator Replacement | Water Supply | Generators, power and electrical | $800K | 2025 |
| 8 | 2025 Annual Sewer Televising | Sewer | Sewer rehabilitation and I&I | $750K | 2025–2035 |
| 9 | Washington Avenue Storm Sewer Upgrades, Phase I | Sewer | Sewer rehabilitation and I&I | $690K | 2025 |
| 10 | Pump Replacement | Sewer | Pump stations | $655K | 2027–2031 |
36 more line items in Findlay, with descriptions and contacts
Klarifi holds every Findlay line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$20M
44 items
2026
$75K
1 items
2027
$655K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 28 | $14M | 70% |
| Water Supply | 10 | $3M | 14% |
| Water Distribution | 8 | $3M | 16% |
1 publicly owned treatment plant in Findlay with 1 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Findlay WPCF | 7.22 | OH0025135 | 1 |
Sources and methodology
Budgets and years are as published in Findlay’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2034 (46 line items).
Data refreshed September 11, 2026.