31 line items · $33M · starting 2026–2030 · 1 plan
Smithfield's published capital plans list 31 water, sewer and wastewater line items with a combined planning budget of $33M, of which 24 items worth $13M sit in the wastewater and sewer departments. The largest single item is Harris Road Water Main Installation at $5M (2030–2031). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Harris Road Water Main Installation | Water Distribution | Water mains and distribution | $5M | 2030–2031 |
| 2 | GWH Water Main Installation | Water Distribution | Water mains and distribution | $4M | 2025–2028 |
| 3 | Joint Wholesale Water Supply with the Greenville Water District | Water Supply | Water mains and distribution | $3M | 2037–2038 |
| 4 | Water Main Installation - Rte. 116 | Water Distribution | Water mains and distribution | $3M | 2035–2036 |
| 5 | SSES Program (Sanitary Sewer Evaluation Studies) | Sewer | Sewer rehabilitation and I&I | $2M | 2025–2044 |
| 6 | Water Supply Storage Facility | Water Supply | Storage tanks and reservoirs | $2M | 2030–2033 |
| 7 | Camp Street Pump Station Upgrade - Collection System | Sewer | Pump stations | $2M | 2025–2029 |
| 8 | Water Main Replacement Rte. 7 & Rte. 295 Bridge | Water Distribution | Water mains and distribution | $2M | 2025 |
| 9 | Whipple Avenue Pump Station Upgrade - Collection System | Sewer | Pump stations | $1M | 2025–2031 |
| 10 | WWTF Chlorination & Disinfection System Upgrades | Wastewater | Disinfection and UV | $755K | 2027–2030 |
21 more line items in Smithfield, with descriptions and contacts
Klarifi holds every Smithfield line item with its description, the page it appears on and the source document, plus 21 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$14M
13 items
2026
$420K
1 items
2027
$755K
1 items
2028
$320K
1 items
2030
$8M
3 items
2032 and later
$10M
12 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 7 | $3M | 10% |
| Sewer | 17 | $10M | 31% |
| Water Supply | 3 | $5M | 16% |
| Water Distribution | 4 | $14M | 43% |
1 publicly owned treatment plant in Smithfield with 3 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Smithfield Wastewater Treatment Plant | 1.35 | RI0100251 | 3 |
Sources and methodology
Budgets and years are as published in Smithfield’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2044 (31 line items).
Data refreshed September 11, 2026.