15 line items · $62M · starting 2026 · 1 plan
Westerly's published capital plans list 15 water, sewer and wastewater line items with a combined planning budget of $62M, of which 5 items worth $53M sit in the wastewater and sewer departments. The largest single item is RIDEM Upgrade Requirements (Design 2024) (Construction TBD) at $50M (2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | RIDEM Upgrade Requirements (Design 2024) (Construction TBD) | Wastewater | — | $50M | 2026 |
| 2 | Disinfection System Upgrade | Water Supply | Disinfection and UV | $2M | 2025–2029 |
| 3 | Pipeline Rehabilitation | Water Distribution | Water mains and distribution | $2M | 2025–2029 |
| 4 | Sewer Evaluation Study | Sewer | Sewer rehabilitation and I&I | $1M | 2025–2029 |
| 5 | Water Main - Bowling Lane | Water Distribution | Water mains and distribution | $1M | 2025–2026 |
| 6 | Cherenzia Excavation - Contractual Agreement | Water Distribution | — | $1M | 2025–2029 |
| 7 | Scada System | Water Supply | SCADA, controls and instrumentation | $825K | 2025–2029 |
| 8 | STP Capital Program | Sewer | Wastewater treatment plant upgrades | $750K | 2025–2029 |
| 9 | Building & Infrastructure Improvements | Wastewater | Buildings, HVAC and site work | $500K | 2025–2029 |
| 10 | Building Improvements | Water Supply | Buildings, HVAC and site work | $500K | 2025–2029 |
5 more line items in Westerly, with descriptions and contacts
Klarifi holds every Westerly line item with its description, the page it appears on and the source document, plus 22 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$12M
14 items
2026
$50M
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 2 | $51M | 82% |
| Sewer | 3 | $2M | 4% |
| Water Supply | 4 | $4M | 6% |
| Water Distribution | 6 | $5M | 8% |
1 publicly owned treatment plant in Westerly with 7 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Westerly Wastewater Treatment Facility | 1.56 | RI0100064 | 7 |
Sources and methodology
Budgets and years are as published in Westerly’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2029 (15 line items).
Data refreshed September 11, 2026.