52 line items · $157M · starting 2026–2030 · 1 plan
Warwick's published capital plans list 52 water, sewer and wastewater line items with a combined planning budget of $157M, of which 36 items worth $130M sit in the wastewater and sewer departments. The largest single item is Northwest Gorton Pond Low-Pressure Sewer System at $13M (2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Northwest Gorton Pond Low-Pressure Sewer System | Wastewater | Sewer rehabilitation and I&I | $13M | 2028 |
| 2 | Upgrade to BNR System (Internal Recycling, Diffusers, Actuators) | Wastewater | Nutrient removal | $11M | 2028 |
| 3 | Oakland Beach Pump Station Replacement (Upgrade & Climate Resiliency) | Wastewater | Pump stations | $8M | 2026 |
| 4 | Improvement to Biosolids Dewatering and Disposal Phase I | Wastewater | Biosolids, sludge and dewatering | $7M | 2026 |
| 5 | Improvement to Biosolids Dewatering and Disposal Phase II | Wastewater | Biosolids, sludge and dewatering | $7M | 2027 |
| 6 | Pilgrim Estates | Wastewater | — | $7M | 2030 |
| 7 | Water Main Replacement Program | Water Distribution | Water mains and distribution | $7M | 2026–2030 |
| 8 | Installation of Primary Tank #3 | Wastewater | Storage tanks and reservoirs | $7M | 2029 |
| 9 | Oakland Beach Force Main | Wastewater | Force mains and interceptors | $6M | 2026 |
| 10 | Loveday Interceptor Rehabilitation | Wastewater | Force mains and interceptors | $5M | 2027 |
42 more line items in Warwick, with descriptions and contacts
Klarifi holds every Warwick line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$845K
2 items
2026
$50M
14 items
2027
$37M
16 items
2028
$36M
10 items
2029
$20M
7 items
2030
$13M
3 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 35 | $128M | 81% |
| Sewer | 1 | $2M | 2% |
| Water Distribution | 16 | $27M | 17% |
No publicly owned treatment plant is recorded under Warwick in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Rhode Island.
Sources and methodology
Budgets and years are as published in Warwick’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2030 (52 line items).
Data refreshed September 11, 2026.