Klarifi Logo
Try for freeLog in
Klarifi Logo

Newport, Rhode Island: water and wastewater capital improvement projects

29 line items · $60M · starting 2026–2029 · 1 plan

Newport's published capital plans list 29 water, sewer and wastewater line items with a combined planning budget of $60M, of which 14 items worth $25M sit in the wastewater and sewer departments. The largest single item is Per & Polfluoroalkyl Substances (PFAS) at $13M (2025–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Newport

The 10 largest water, sewer and wastewater line items in Newport’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Per & Polfluoroalkyl Substances (PFAS)Water DistributionPFAS treatment$13M2025–2030
2CSO System Master Plan ImplementationSewerStormwater and flood resilience$5M2025–2030
3Water Infrastructure Resilience ProiectsWater DistributionStormwater and flood resilience$5M2025–2030
4Storm Drain ImprovementsSewerStormwater and flood resilience$4M2025–2030
5Lead Service Line ReplacementWater DistributionLead service line replacement$3M2025–2030
6System Wide Main ImprovementsWater SupplyWater mains and distribution$3M2025–2030
7Sewer Inflow & Infiltration RemovalSewerMembranes and filtration$3M2025–2030
8EquipmentSewerVehicles and equipment$2M2025–2030
9Forest Ave Pump StationSewerPump stations$2M2026–2030
10Equipment Replacement-WaterWater DistributionVehicles and equipment$2M2025–2029

19 more line items in Newport, with descriptions and contacts

Klarifi holds every Newport line item with its description, the page it appears on and the source document, plus 22 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$55M

24 items

2026

$4M

3 items

2028

$200K

1 items

2029

$200K

1 items

By department

Line items and planning budgets by department, Newport.
DepartmentLine itemsBudgetShare
Sewer14$25M42%
Water Supply3$5M8%
Water Distribution12$30M50%

Project types in Newport's plan

Wastewater treatment plants in Newport

1 publicly owned treatment plant in Newport with 24 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Newport Water Pollution Control Facility5.3RI010029324

Other Rhode Island cities with capital plans

Newport capital plan questions

Sources and methodology

Budgets and years are as published in Newport’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2030 (29 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free