Narragansett, Rhode Island: water and wastewater capital improvement projects

18 line items · $23M · starting 2026–2029 · 1 plan

Narragansett's published capital plans list 18 water, sewer and wastewater line items with a combined planning budget of $23M, of which 9 items worth $13M sit in the wastewater and sewer departments. The largest single item is Water Main Replacement Program at $6M (2025–2031). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Narragansett

The 10 largest water, sewer and wastewater line items in Narragansett’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Water Main Replacement ProgramWater DistributionWater mains and distribution$6M2025–2031
2Pump Station UpgradesSewerPump stations$4M2025–2031
3Scarborough WWTFWastewaterWastewater treatment plant upgrades$3M2025–2031
4Wastewater Facilities Plan UpdateWastewaterWastewater treatment plant upgrades$2M2026–2031
5Scarborough WWTF Outfall RestorationWastewaterForce mains and interceptors$2M2026–2028
6Radio Read Hardware upgrade ProgramWater DistributionMeters and AMI$2M2025–2026
7Building and Tank Improvements ProgramWater SupplyStorage tanks and reservoirs$1M2025–2031
8Regional WW TFWastewaterWastewater treatment plant upgrades$856K2025–2031
9General System ImprovementsWater Distribution$600K2025–2031
10Sand Hill Cove I\I RemovalSewerMembranes and filtration$550K2025–2031

8 more line items in Narragansett, with descriptions and contacts

Klarifi holds every Narragansett line item with its description, the page it appears on and the source document, plus 30 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$18M

13 items

2026

$5M

4 items

2029

$155K

1 items

By department

Line items and planning budgets by department, Narragansett.
DepartmentLine itemsBudgetShare
Wastewater4$8M35%
Sewer5$5M22%
Water Supply2$1M6%
Water Distribution7$8M37%

Wastewater treatment plants in Narragansett

1 publicly owned treatment plant in Narragansett with 113 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Scarborough Wastewater Treatment Facility0.39RI0100188113

Other Rhode Island cities with capital plans

Narragansett capital plan questions

Sources and methodology

Budgets and years are as published in Narragansett’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2031 (18 line items).

Data refreshed September 11, 2026.