18 line items · $23M · starting 2026–2029 · 1 plan
Narragansett's published capital plans list 18 water, sewer and wastewater line items with a combined planning budget of $23M, of which 9 items worth $13M sit in the wastewater and sewer departments. The largest single item is Water Main Replacement Program at $6M (2025–2031). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Water Main Replacement Program | Water Distribution | Water mains and distribution | $6M | 2025–2031 |
| 2 | Pump Station Upgrades | Sewer | Pump stations | $4M | 2025–2031 |
| 3 | Scarborough WWTF | Wastewater | Wastewater treatment plant upgrades | $3M | 2025–2031 |
| 4 | Wastewater Facilities Plan Update | Wastewater | Wastewater treatment plant upgrades | $2M | 2026–2031 |
| 5 | Scarborough WWTF Outfall Restoration | Wastewater | Force mains and interceptors | $2M | 2026–2028 |
| 6 | Radio Read Hardware upgrade Program | Water Distribution | Meters and AMI | $2M | 2025–2026 |
| 7 | Building and Tank Improvements Program | Water Supply | Storage tanks and reservoirs | $1M | 2025–2031 |
| 8 | Regional WW TF | Wastewater | Wastewater treatment plant upgrades | $856K | 2025–2031 |
| 9 | General System Improvements | Water Distribution | — | $600K | 2025–2031 |
| 10 | Sand Hill Cove I\I Removal | Sewer | Membranes and filtration | $550K | 2025–2031 |
8 more line items in Narragansett, with descriptions and contacts
Klarifi holds every Narragansett line item with its description, the page it appears on and the source document, plus 30 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$18M
13 items
2026
$5M
4 items
2029
$155K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 4 | $8M | 35% |
| Sewer | 5 | $5M | 22% |
| Water Supply | 2 | $1M | 6% |
| Water Distribution | 7 | $8M | 37% |
1 publicly owned treatment plant in Narragansett with 113 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Scarborough Wastewater Treatment Facility | 0.39 | RI0100188 | 113 |
Sources and methodology
Budgets and years are as published in Narragansett’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2031 (18 line items).
Data refreshed September 11, 2026.