6 line items · $13M · 1 plan
Victoria's published capital plans list 6 water, sewer and wastewater line items with a combined planning budget of $13M, of which 6 items worth $13M sit in the wastewater and sewer departments. The largest single item is CIP Water SCADA Program at $6M (2024–2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | CIP Water SCADA Program | Wastewater | SCADA, controls and instrumentation | $6M | 2024–2025 |
| 2 | CIP Utility Program | Wastewater | — | $4M | 2024–2025 |
| 3 | Residential Projects | Wastewater | — | $1M | 2024–2025 |
| 4 | CIP Regional WWTR Project 1. Ph. I | Wastewater | — | $1M | 2024–2025 |
| 5 | Odem Street | Sewer | Sewer rehabilitation and I&I | $337K | 2024–2025 |
| 6 | Citywide LED Project | Wastewater | — | $250K | 2024–2025 |
Descriptions, page references and contacts for Victoria
Klarifi holds every Victoria line item with its description, the page it appears on and the source document, plus 16 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$13M
6 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 5 | $13M | 97% |
| Sewer | 1 | $337K | 3% |
3 publicly owned treatment plants in Victoria with 22 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Victoria Regional WWTP | 8.05 | TX0025186 | 7 |
| Odem Street WWTP | 3.19 | TX0132829 | 13 |
| Aloe Field WWTF | 0.14 | TX0023477 | 2 |
Sources and methodology
Budgets and years are as published in Victoria’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: Adopted Budget 2025 (6 line items).
Data refreshed September 11, 2026.