Klarifi Logo
Try for freeLog in
Klarifi Logo

Beaumont, California: water and wastewater capital improvement projects

22 line items · $14M · starting 2026–2028 · 1 plan

Beaumont's published capital plans list 22 water, sewer and wastewater line items with a combined planning budget of $14M, of which 22 items worth $14M sit in the wastewater and sewer departments. The largest single item is On-going Pipeline Replacement Program at $3M (2026–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Beaumont

The 10 largest water, sewer and wastewater line items in Beaumont’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1On-going Pipeline Replacement ProgramSewerWater mains and distribution$3M2026–2030
2Lift Station ConditionSewerLift stations$2M2026–2029
3WWTP Solar GenerationWastewaterWastewater treatment plant upgrades$2M2026
4CentrifugesWastewaterBiosolids, sludge and dewatering$1M2026
5Vactor TruckWastewaterVehicles and equipment$827K2027
6Permanent Repair to Embankment adjacent to Oak Valley PkwyWastewater$779K2026–2027
7Fine ScreensWastewaterHeadworks, screening and grit$750K2026
8Office ExpansionWastewaterBuildings, HVAC and site work$500K2027
9WWTP Aeration SleevesWastewaterAeration and blowers$486K2026–2030
10Illinois Ave Pipeline ReplacementSewerWater mains and distribution$400K2027

12 more line items in Beaumont, with descriptions and contacts

Klarifi holds every Beaumont line item with its description, the page it appears on and the source document, plus 23 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

2026

$10M

12 items

2027

$2M

6 items

2028

$1M

4 items

By department

Line items and planning budgets by department, Beaumont.
DepartmentLine itemsBudgetShare
Wastewater12$7M51%
Sewer10$7M49%

Project types in Beaumont's plan

Wastewater treatment plants in Beaumont

1 publicly owned treatment plant in Beaumont with 14 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Beaumont WWTF3.54CA010537614

Other California cities with capital plans

Beaumont capital plan questions

Sources and methodology

Budgets and years are as published in Beaumont’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2026–2030 (22 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free