22 line items · $824M · 1 plan
Ventura's published capital plans list 22 water, sewer and wastewater line items with a combined planning budget of $824M, of which 13 items worth $655M sit in the wastewater and sewer departments. The largest single item is Wastewater Plant - Membrane Bio-Reactor/UV Disinfection (VWP)3 at $302M (2025–2031). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Wastewater Plant - Membrane Bio-Reactor/UV Disinfection (VWP)3 | Wastewater | Disinfection and UV | $302M | 2025–2031 |
| 2 | Wastewater Plant - Advanced Purification Facility (VWP) | Wastewater | Wastewater treatment plant upgrades | $200M | 2025–2031 |
| 3 | Outfall Pump Station and Temporary Facilities (VWP) | Wastewater | Pump stations | $116M | 2025–2026 |
| 4 | Oxnard Plain Basin Storage (VWP) | Water Supply | — | $82M | 2025–2031 |
| 5 | State Water Interconnection Project | Water Supply | — | $47M | 2025–2028 |
| 6 | Waterline - Eastside to Midtown Interconnection | Water Supply | Water mains and distribution | $14M | 2025 |
| 7 | Pump Station - Kalorama Replacement | Sewer | Pump stations | $10M | 2025–2028 |
| 8 | Well - Repair and Restoration of Intake Structure | Water Supply | Wells and groundwater | $7M | 2025–2026 |
| 9 | Nye 7 & 8 Conveyance Pipe Reroute | Water Distribution | — | $7M | 2025–2027 |
| 10 | Pump Station - Loma Vista BPS | Sewer | Pump stations | $6M | 2025–2026 |
12 more line items in Ventura, with descriptions and contacts
Klarifi holds every Ventura line item with its description, the page it appears on and the source document, plus 15 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$824M
22 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 9 | $630M | 76% |
| Sewer | 4 | $25M | 3% |
| Water Supply | 7 | $162M | 20% |
| Water Distribution | 2 | $8M | 1% |
2 publicly owned treatment plants in Ventura with 347 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Ojai Valley WWTP | 1.56 | CA0053961 | 289 |
| Ventura Water Reclamation Facility | — | CAC458580 | 58 |
Sources and methodology
Budgets and years are as published in Ventura’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2031 (22 line items).
Data refreshed September 11, 2026.