Ventura, California: water and wastewater capital improvement projects

22 line items · $824M · 1 plan

Ventura's published capital plans list 22 water, sewer and wastewater line items with a combined planning budget of $824M, of which 13 items worth $655M sit in the wastewater and sewer departments. The largest single item is Wastewater Plant - Membrane Bio-Reactor/UV Disinfection (VWP)3 at $302M (2025–2031). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Ventura

The 10 largest water, sewer and wastewater line items in Ventura’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Wastewater Plant - Membrane Bio-Reactor/UV Disinfection (VWP)3WastewaterDisinfection and UV$302M2025–2031
2Wastewater Plant - Advanced Purification Facility (VWP)WastewaterWastewater treatment plant upgrades$200M2025–2031
3Outfall Pump Station and Temporary Facilities (VWP)WastewaterPump stations$116M2025–2026
4Oxnard Plain Basin Storage (VWP)Water Supply$82M2025–2031
5State Water Interconnection ProjectWater Supply$47M2025–2028
6Waterline - Eastside to Midtown InterconnectionWater SupplyWater mains and distribution$14M2025
7Pump Station - Kalorama ReplacementSewerPump stations$10M2025–2028
8Well - Repair and Restoration of Intake StructureWater SupplyWells and groundwater$7M2025–2026
9Nye 7 & 8 Conveyance Pipe RerouteWater Distribution$7M2025–2027
10Pump Station - Loma Vista BPSSewerPump stations$6M2025–2026

12 more line items in Ventura, with descriptions and contacts

Klarifi holds every Ventura line item with its description, the page it appears on and the source document, plus 15 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$824M

22 items

By department

Line items and planning budgets by department, Ventura.
DepartmentLine itemsBudgetShare
Wastewater9$630M76%
Sewer4$25M3%
Water Supply7$162M20%
Water Distribution2$8M1%

Project types in Ventura's plan

Wastewater treatment plants in Ventura

2 publicly owned treatment plants in Ventura with 347 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Ojai Valley WWTP1.56CA0053961289
Ventura Water Reclamation FacilityCAC45858058

Other California cities with capital plans

Ventura capital plan questions

Sources and methodology

Budgets and years are as published in Ventura’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2026–2031 (22 line items).

Data refreshed September 11, 2026.