21 line items · $200M · starting 2026 · 1 plan
Riverside's published capital plans list 21 water, sewer and wastewater line items with a combined planning budget of $200M, of which 7 items worth $14M sit in the wastewater and sewer departments. The largest single item is Main Replacements Program at $62M (2024–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Main Replacements Program | Water Distribution | Water mains and distribution | $62M | 2024–2029 |
| 2 | Transmission Mains | Water Distribution | Water mains and distribution | $46M | 2024–2029 |
| 3 | Potable/Irrigation Well Replacements | Water Supply | Wells and groundwater | $14M | 2024–2029 |
| 4 | Distribution System Facilities Replacements | Water Supply | Water mains and distribution | $14M | 2024–2029 |
| 5 | Recycled Water - Jackson Street Phase I Facilities & Site Conversions | Water Distribution | Water reuse and reclaimed water | $13M | 2025–2027 |
| 6 | Facility Rehabilitation Program | Water Supply | SCADA, controls and instrumentation | $11M | 2024–2029 |
| 7 | System Expansion | Water Supply | Water mains and distribution | $9M | 2024–2029 |
| 8 | Water Quality Control Plant - Upgrade Flow Meters to Electromagnetic Meters | Sewer | Meters and AMI | $6M | 2024–2025 |
| 9 | SCADA Upgrade & System Automation | Water Supply | SCADA, controls and instrumentation | $5M | 2024–2027 |
| 10 | Meters | Water Supply | Meters and AMI | $5M | 2024–2029 |
11 more line items in Riverside, with descriptions and contacts
Klarifi holds every Riverside line item with its description, the page it appears on and the source document, plus 8 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$200M
20 items
2026
$39K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 7 | $14M | 7% |
| Water Supply | 11 | $65M | 33% |
| Water Distribution | 3 | $121M | 61% |
1 publicly owned treatment plant in Riverside with 2 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Riverside City, Water Quality Control | 27.72 | CA0105350 | 2 |
Sources and methodology
Budgets and years are as published in Riverside’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2029 (21 line items).
Data refreshed September 11, 2026.