51 line items · $463M · starting 2027–2028 · 1 plan
Oceanside's published capital plans list 51 water, sewer and wastewater line items with a combined planning budget of $463M, of which 35 items worth $371M sit in the wastewater and sewer departments. The largest single item is Buccaneer Lift Station at $76M (2024–2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Buccaneer Lift Station | Sewer | Lift stations | $76M | 2024–2028 |
| 2 | Well Expansion and Brine Minimization Project | Water Supply | Wells and groundwater | $33M | 2024–2028 |
| 3 | Land Outfall | Sewer | Force mains and interceptors | $28M | 2024–2029 |
| 4 | OMG Force Main | Sewer | Force mains and interceptors | $27M | 2024–2027 |
| 5 | OMG Lift Station (Former El Corazon Lift Station) | Sewer | Lift stations | $26M | 2024–2027 |
| 6 | SLRWRF Major Improvements | Sewer | Odor and corrosion control | $22M | 2024–2029 |
| 7 | BV Lift Station Replacement | Sewer | Lift stations | $22M | 2024–2029 |
| 8 | Downtown Water Pipeline Phase 2 of 5 | Wastewater | Water mains and distribution | $21M | 2024–2027 |
| 9 | Upper Recycled Package | Water Distribution | Water mains and distribution | $20M | 2024–2027 |
| 10 | North Valley Lift Station (New 2024–25) | Sewer | Lift stations | $18M | 2024–2027 |
41 more line items in Oceanside, with descriptions and contacts
Klarifi holds every Oceanside line item with its description, the page it appears on and the source document, plus 4 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$461M
48 items
2027
$1M
1 items
2028
$925K
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 6 | $36M | 8% |
| Sewer | 29 | $334M | 72% |
| Water Supply | 8 | $51M | 11% |
| Water Distribution | 8 | $42M | 9% |
1 publicly owned treatment plant in Oceanside with 5 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Oceanside Ocean Outfall | 10.7 | CA0107433 | 5 |
Sources and methodology
Budgets and years are as published in Oceanside’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2029 (51 line items).
Data refreshed September 11, 2026.