Oxnard, California: water and wastewater capital improvement projects

25 line items · $245M · starting 2026–2029 · 1 plan

Oxnard's published capital plans list 25 water, sewer and wastewater line items with a combined planning budget of $245M, of which 10 items worth $106M sit in the wastewater and sewer departments. The largest single item is Wastewater OWTP: Primary Clarifiers and Activated Sludge Improvements at $43M (2025–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Oxnard

The 10 largest water, sewer and wastewater line items in Oxnard’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Wastewater OWTP: Primary Clarifiers and Activated Sludge ImprovementsWastewaterBiosolids, sludge and dewatering$43M2025–2027
2Water Distribution: Oxnard Conduit Replacement ProjectWater DistributionWater mains and distribution$42M2025–2028
3Recycled Water: AWPF Improvements and ExpansionWater SupplyWater reuse and reclaimed water$33M2025–2029
4Water Distribution: Kamala Park Neighborhood Cast Iron Pipe ReplacementWater DistributionWater mains and distribution$27M2025–2027
5Wastewater OWTP: Digester/Cogeneration ImprovementsWastewaterAnaerobic digesters and biogas$17M2025–2029
6Wastewater OWTP: Interstage Pump Station and Bio-tower DemolitionWastewaterPump stations$13M2025–2029
7Water Distribution: Hobson Park East Neighborhood Cast Iron Pipe ReplacementWater DistributionWater mains and distribution$12M2025–2027
8Wastewater OWTP: Maintenance Office Building, Machine Shop, and StorageWastewaterBuildings, HVAC and site work$8M2026–2027
9Wastewater Collection: Lift Station ImprovementsWastewaterLift stations$8M2025–2027
10Water Production: Groundwater Desalter Improvement ProjectWater SupplyWater treatment plants$8M2025–2026

15 more line items in Oxnard, with descriptions and contacts

Klarifi holds every Oxnard line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$219M

16 items

2026

$14M

3 items

2027

$9M

4 items

2028

$2M

1 items

2029

$2M

1 items

By department

Line items and planning budgets by department, Oxnard.
DepartmentLine itemsBudgetShare
Wastewater8$99M40%
Sewer2$7M3%
Water Supply11$54M22%
Water Distribution4$86M35%

Project types in Oxnard's plan

Wastewater treatment plants in Oxnard

1 publicly owned treatment plant in Oxnard with 137 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Oxnard Wastewater Treatment Plant (owtp)16.6CAL054097137

Other California cities with capital plans

Oxnard capital plan questions

Sources and methodology

Budgets and years are as published in Oxnard’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2029 (25 line items).

Data refreshed September 11, 2026.