Santa Barbara, California: water and wastewater capital improvement projects

19 line items · $450M · starting 2029 · 1 plan

Santa Barbara's published capital plans list 19 water, sewer and wastewater line items with a combined planning budget of $450M, of which 8 items worth $105M sit in the wastewater and sewer departments. The largest single item is Vic Trace Reservoir Replacement and Resiliency Project at $125M (2025–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Santa Barbara

The 10 largest water, sewer and wastewater line items in Santa Barbara’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Vic Trace Reservoir Replacement and Resiliency ProjectWater SupplyStormwater and flood resilience$125M2025–2030
2Water Main Replacement ProgramWater DistributionWater mains and distribution$111M2025–2031
3Cater Reservoir Resiliency ProjectWater SupplyStormwater and flood resilience$44M2025–2027
4El Estero Water Resource Center Electrical Distribution RenewalWastewaterWater mains and distribution$31M2025–2027
5El Estero Water Resource Center Maintenance ProgramWastewaterBiosolids, sludge and dewatering$27M2025–2031
6Desalination ProgramWater SupplyPump stations$26M2025–2031
7Reservoir ProgramWater SupplyStorage tanks and reservoirs$23M2025–2031
8Sanitary Sewer Overflow Compliance ProgramSewerSewer rehabilitation and I&I$19M2025–2031
9Lift Station Maintenance ProgramSewerLift stations$14M2025–2031
10Sanitary Sewer Capacity Improvement ProgramSewerSewer rehabilitation and I&I$11M2025–2031

9 more line items in Santa Barbara, with descriptions and contacts

Klarifi holds every Santa Barbara line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$449M

18 items

2029

$200K

1 items

By department

Line items and planning budgets by department, Santa Barbara.
DepartmentLine itemsBudgetShare
Wastewater4$58M13%
Sewer4$47M10%
Water Supply8$232M52%
Water Distribution3$112M25%

Project types in Santa Barbara's plan

Wastewater treatment plants in Santa Barbara

2 publicly owned treatment plants in Santa Barbara with 18 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Montecito Sd WWTP0.58CAL0478998
El Estero WWTPCA004814310

Other California cities with capital plans

Santa Barbara capital plan questions

Sources and methodology

Budgets and years are as published in Santa Barbara’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2026–2030 (19 line items).

Data refreshed September 11, 2026.