Brentwood, California: water and wastewater capital improvement projects

22 line items · $74M · starting 2027–2028 · 1 plan

Brentwood's published capital plans list 22 water, sewer and wastewater line items with a combined planning budget of $74M, of which 11 items worth $54M sit in the wastewater and sewer departments. The largest single item is Wastewater Treatment Plant Expansion - Phase II at $30M (2025–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Brentwood

The 10 largest water, sewer and wastewater line items in Brentwood’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Wastewater Treatment Plant Expansion - Phase IIWastewaterWastewater treatment plant upgrades$30M2025–2027
2Brentwood Manor Water and Wastewater RehabilitationWater DistributionSewer rehabilitation and I&I$6M2025–2026
3Pump Station 2.4 InstallationWater DistributionPump stations$4M2025–2026
4Wastewater Treatment Plant Tertiary Filter ExpansionWastewaterMembranes and filtration$4M2028–2029
5Brentwood Boulevard Wastewater RehabilitationSewerMembranes and filtration$4M2025–2026
6Wastewater Treatment Plant Secondary Clarifier ReplacementWastewaterClarifiers and settling$4M2028–2029
7Wastewater Treatment Plant Headworks RehabilitationWastewaterHeadworks, screening and grit$3M2025–2028
8Water and Wastewater LaboratoryWastewaterBuildings, HVAC and site work$3M2025–2026
9Water and Wastewater SCADA System UpgradeWastewaterSCADA, controls and instrumentation$2M2025–2027
10On-Site Chlorine Generation System UpgradeWater SupplyDisinfection and UV$2M2025–2026

12 more line items in Brentwood, with descriptions and contacts

Klarifi holds every Brentwood line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$64M

19 items

2027

$2M

1 items

2028

$8M

2 items

By department

Line items and planning budgets by department, Brentwood.
DepartmentLine itemsBudgetShare
Wastewater6$46M62%
Sewer5$8M11%
Water Supply2$3M4%
Water Distribution9$17M23%

Project types in Brentwood's plan

Wastewater treatment plants in Brentwood

1 publicly owned treatment plant in Brentwood with 17 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Brentwood Wastewater Treatment Plant1.46CA008266017

Other California cities with capital plans

Brentwood capital plan questions

Sources and methodology

Budgets and years are as published in Brentwood’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2030 (22 line items).

Data refreshed September 11, 2026.