Chino, California: water and wastewater capital improvement projects

27 line items · $90M · starting 2026–2027 · 1 plan

Chino's published capital plans list 27 water, sewer and wastewater line items with a combined planning budget of $90M, of which 4 items worth $11M sit in the wastewater and sewer departments. The largest single item is State Street Water Treatment Project at $17M (2025–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Chino

The 10 largest water, sewer and wastewater line items in Chino’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1State Street Water Treatment ProjectWater DistributionWater treatment plants$17M2025–2026
2Phillips Reservoir 2 DemoWater SupplyStorage tanks and reservoirs$8M2025–2030
3Sewer Rehab FY2026- Grand Ave-Pipeline to Roswell, Roswell Ave-Grand Ave to SchaeferSewerSewer rehabilitation and I&I$6M2026–2030
4790 Booster PumpsWater DistributionPump stations$6M2026–2028
5Benson Water Treatment Facility Emergency Power Generator Project- DesignWater SupplyWastewater treatment plant upgrades$5M2027–2028
6Pipeline Replacement Program - Phase IWater DistributionWater mains and distribution$5M2026–2028
7Well 17 Equipping ProjectWater SupplyWells and groundwater$5M2025–2026
8Water Main Replacement Philadelphia & WalnutWater DistributionWater mains and distribution$4M2025–2027
9Reservoir 4 Rehabilitation PhillipsWater SupplyStorage tanks and reservoirs$4M2026–2030
10Benson Reservoir 3 (1.5mg) Improvement ProjectWater SupplyStorage tanks and reservoirs$4M2025–2026

17 more line items in Chino, with descriptions and contacts

Klarifi holds every Chino line item with its description, the page it appears on and the source document, plus 5 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$49M

14 items

2026

$36M

11 items

2027

$5M

2 items

By department

Line items and planning budgets by department, Chino.
DepartmentLine itemsBudgetShare
Sewer4$11M12%
Water Supply9$30M33%
Water Distribution14$50M55%

Project types in Chino's plan

Wastewater treatment plants in Chino

1 publicly owned treatment plant in Chino with 519 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Chino6.4CA8000409519

Other California cities with capital plans

Chino capital plan questions

Sources and methodology

Budgets and years are as published in Chino’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2031 (27 line items).