15 line items · $15M · starting 2026 · 1 plan
Fortuna's published capital plans list 15 water, sewer and wastewater line items with a combined planning budget of $15M, of which 7 items worth $11M sit in the wastewater and sewer departments. The largest single item is NPDES Compliance at $6M (2024–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | NPDES Compliance | Wastewater | — | $6M | 2024–2026 |
| 2 | Sewer Lining Project | Sewer | Sewer rehabilitation and I&I | $3M | 2024–2026 |
| 3 | Corrosion Control Facility Piping Project | Water Distribution | Odor and corrosion control | $2M | 2024–2026 |
| 4 | Sanitary Sewer CCTV Project | Sewer | Sewer rehabilitation and I&I | $1M | 2024–2025 |
| 5 | Downtown Water Line Replacement | Water Distribution | Water mains and distribution | $795K | 2024–2026 |
| 6 | Annual Water Valve Replacement Project | Water Distribution | Water mains and distribution | $450K | 2024–2026 |
| 7 | Vancil Reservoir Site Rehabilitation Project | Water Supply | Storage tanks and reservoirs | $450K | 2024–2026 |
| 8 | Carson Woods Waterline Replacement Project | Water Distribution | Water mains and distribution | $408K | 2024–2026 |
| 9 | WWTP Secondary Clarifier Recoating Project | Wastewater | Clarifiers and settling | $400K | 2024–2026 |
| 10 | P Street Sewer Replacement Project | Sewer | Sewer rehabilitation and I&I | $308K | 2024–2025 |
5 more line items in Fortuna, with descriptions and contacts
Klarifi holds every Fortuna line item with its description, the page it appears on and the source document, plus 4 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$15M
14 items
2026
$200K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 3 | $6M | 40% |
| Sewer | 4 | $5M | 33% |
| Water Supply | 2 | $750K | 5% |
| Water Distribution | 6 | $3M | 23% |
1 publicly owned treatment plant in Fortuna with 122 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| City Of Fortuna - Municipal Wastewater Plant | 0.71 | CA0022730 | 122 |
Sources and methodology
Budgets and years are as published in Fortuna’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2026 (15 line items).
Data refreshed September 11, 2026.