Fortuna, California: water and wastewater capital improvement projects

15 line items · $15M · starting 2026 · 1 plan

Fortuna's published capital plans list 15 water, sewer and wastewater line items with a combined planning budget of $15M, of which 7 items worth $11M sit in the wastewater and sewer departments. The largest single item is NPDES Compliance at $6M (2024–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Fortuna

The 10 largest water, sewer and wastewater line items in Fortuna’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1NPDES ComplianceWastewater$6M2024–2026
2Sewer Lining ProjectSewerSewer rehabilitation and I&I$3M2024–2026
3Corrosion Control Facility Piping ProjectWater DistributionOdor and corrosion control$2M2024–2026
4Sanitary Sewer CCTV ProjectSewerSewer rehabilitation and I&I$1M2024–2025
5Downtown Water Line ReplacementWater DistributionWater mains and distribution$795K2024–2026
6Annual Water Valve Replacement ProjectWater DistributionWater mains and distribution$450K2024–2026
7Vancil Reservoir Site Rehabilitation ProjectWater SupplyStorage tanks and reservoirs$450K2024–2026
8Carson Woods Waterline Replacement ProjectWater DistributionWater mains and distribution$408K2024–2026
9WWTP Secondary Clarifier Recoating ProjectWastewaterClarifiers and settling$400K2024–2026
10P Street Sewer Replacement ProjectSewerSewer rehabilitation and I&I$308K2024–2025

5 more line items in Fortuna, with descriptions and contacts

Klarifi holds every Fortuna line item with its description, the page it appears on and the source document, plus 4 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$15M

14 items

2026

$200K

1 items

By department

Line items and planning budgets by department, Fortuna.
DepartmentLine itemsBudgetShare
Wastewater3$6M40%
Sewer4$5M33%
Water Supply2$750K5%
Water Distribution6$3M23%

Project types in Fortuna's plan

Wastewater treatment plants in Fortuna

1 publicly owned treatment plant in Fortuna with 122 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
City Of Fortuna - Municipal Wastewater Plant0.71CA0022730122

Other California cities with capital plans

Fortuna capital plan questions

Sources and methodology

Budgets and years are as published in Fortuna’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2026 (15 line items).