Klarifi Logo
Try for freeLog in
Klarifi Logo

Lompoc, California: water and wastewater capital improvement projects

23 line items · $35M · starting 2026–2027 · 1 plan

Lompoc's published capital plans list 23 water, sewer and wastewater line items with a combined planning budget of $35M, of which 15 items worth $30M sit in the wastewater and sewer departments. The largest single item is Wastewater Distribution System Renovation and Replacement Program at $21M (2026–2031). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Lompoc

The 10 largest water, sewer and wastewater line items in Lompoc’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Wastewater Distribution System Renovation and Replacement ProgramWastewaterWater mains and distribution$21M2026–2031
2Headworks ImprovementWastewaterHeadworks, screening and grit$3M2026–2028
3Tank Asset Management ProgramWater SupplyStorage tanks and reservoirs$3M2026–2031
4West Central Ave sewer pipeline and manhole replacementWastewaterSewer rehabilitation and I&I$2M2026–2031
5Lime SlakersWater Supply$2M2026
6Biosolids dewatering equipmentWastewaterBiosolids, sludge and dewatering$750K2026–2027
7Emergency Holding Basin LinerWastewater$636K2026–2028
8Uplands Sewer Lift StationWastewaterLift stations$620K2026–2027
9Floradale Monitoring Station ImprovementWastewater$550K2026–2027
10Automated effluent monitoring systemWastewater$180K2026–2027

13 more line items in Lompoc, with descriptions and contacts

Klarifi holds every Lompoc line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

2026

$35M

20 items

2027

$264K

3 items

By department

Line items and planning budgets by department, Lompoc.
DepartmentLine itemsBudgetShare
Wastewater11$29M84%
Sewer4$380K1%
Water Supply7$5M15%
Water Distribution1$120K0%

Project types in Lompoc's plan

Wastewater treatment plants in Lompoc

1 publicly owned treatment plant in Lompoc with 11 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Lompoc Wastewater PlantCA004812711

Other California cities with capital plans

Lompoc capital plan questions

Sources and methodology

Budgets and years are as published in Lompoc’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2031 (23 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free