Klarifi Logo
Try for freeLog in
Klarifi Logo

Long Beach, California: water and wastewater capital improvement projects

18 line items · $70M · 2 plans

Long Beach's published capital plans list 18 water, sewer and wastewater line items with a combined planning budget of $70M, of which 5 items worth $15M sit in the wastewater and sewer departments. The largest single item is New Well Development/Equipment at $9M (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Long Beach

The 10 largest water, sewer and wastewater line items in Long Beach’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1New Well Development/EquipmentWater SupplyWells and groundwater$9M2025
2Recycled Developer ProjectsWater Supply$8M2025
3Well RehabilitationWater SupplyWells and groundwater$5M2025
4Water MiscellaneousWater Supply$5M2025
5Water Pipeline Replace/InstallWater DistributionWater mains and distribution$5M2025
6Water Quality ImprovementsWater SupplyStormwater and flood resilience$5M2025
7Alamitos Reservoir ImprovementsWater SupplyStorage tanks and reservoirs$4M2025
8Large Valve ReplacementWater DistributionWater mains and distribution$4M2025
9Sewer Lift StationsSewerLift stations$4M2025
10Sewer MiscellaneousSewerSewer rehabilitation and I&I$4M2025

8 more line items in Long Beach, with descriptions and contacts

Klarifi holds every Long Beach line item with its description, the page it appears on and the source document, plus 6 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$70M

18 items

By department

Line items and planning budgets by department, Long Beach.
DepartmentLine itemsBudgetShare
Sewer5$15M21%
Water Supply8$42M60%
Water Distribution5$13M19%

Project types in Long Beach's plan

Wastewater treatment plants in Long Beach

1 publicly owned treatment plant in Long Beach with 5 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Long Beach Water Reclamation Plant4.44CA00541195

Other California cities with capital plans

Long Beach capital plan questions

Sources and methodology

Budgets and years are as published in Long Beach’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2027 (2 line items); Adopted Budget 2025 (16 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free