18 line items · $70M · 2 plans
Long Beach's published capital plans list 18 water, sewer and wastewater line items with a combined planning budget of $70M, of which 5 items worth $15M sit in the wastewater and sewer departments. The largest single item is New Well Development/Equipment at $9M (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | New Well Development/Equipment | Water Supply | Wells and groundwater | $9M | 2025 |
| 2 | Recycled Developer Projects | Water Supply | — | $8M | 2025 |
| 3 | Well Rehabilitation | Water Supply | Wells and groundwater | $5M | 2025 |
| 4 | Water Miscellaneous | Water Supply | — | $5M | 2025 |
| 5 | Water Pipeline Replace/Install | Water Distribution | Water mains and distribution | $5M | 2025 |
| 6 | Water Quality Improvements | Water Supply | Stormwater and flood resilience | $5M | 2025 |
| 7 | Alamitos Reservoir Improvements | Water Supply | Storage tanks and reservoirs | $4M | 2025 |
| 8 | Large Valve Replacement | Water Distribution | Water mains and distribution | $4M | 2025 |
| 9 | Sewer Lift Stations | Sewer | Lift stations | $4M | 2025 |
| 10 | Sewer Miscellaneous | Sewer | Sewer rehabilitation and I&I | $4M | 2025 |
8 more line items in Long Beach, with descriptions and contacts
Klarifi holds every Long Beach line item with its description, the page it appears on and the source document, plus 6 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$70M
18 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 5 | $15M | 21% |
| Water Supply | 8 | $42M | 60% |
| Water Distribution | 5 | $13M | 19% |
1 publicly owned treatment plant in Long Beach with 5 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Long Beach Water Reclamation Plant | 4.44 | CA0054119 | 5 |
Sources and methodology
Budgets and years are as published in Long Beach’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2027 (2 line items); Adopted Budget 2025 (16 line items).
Data refreshed September 11, 2026.