Nevada City, California: water and wastewater capital improvement projects

29 line items · $38M · starting 2026–2029 · 1 plan

Nevada City's published capital plans list 29 water, sewer and wastewater line items with a combined planning budget of $38M, of which 13 items worth $17M sit in the wastewater and sewer departments. The largest single item is Additional Reservoir Storage at $9M (2027–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Nevada City

The 10 largest water, sewer and wastewater line items in Nevada City’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Additional Reservoir StorageWater DistributionStorage tanks and reservoirs$9M2027–2029
2Conversion to UVWastewaterDisinfection and UV$6M2028–2029
3Sugarloaf Additional Water TankWater DistributionStorage tanks and reservoirs$5M2028–2030
4Biosolids ProcessingWastewaterBiosolids, sludge and dewatering$3M2026–2028
5Emergency Wastewater Storage BasinsWastewaterWater mains and distribution$2M2028–2030
6Pine Street Water MainWater DistributionWater mains and distribution$2M2026–2027
7Aerobic DigestorWastewaterBiosolids, sludge and dewatering$1M2027–2029
8Raw Water Pipe to Cascade CanalWater DistributionWater mains and distribution$1M2026–2027
9HeadworksWastewaterHeadworks, screening and grit$800K2026–2027
10Annual Sewer Main ReplacementsSewerSewer rehabilitation and I&I$750K2025–2030

19 more line items in Nevada City, with descriptions and contacts

Klarifi holds every Nevada City line item with its description, the page it appears on and the source document, plus 7 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$2M

5 items

2026

$10M

15 items

2027

$12M

4 items

2028

$14M

4 items

2029

$570K

1 items

By department

Line items and planning budgets by department, Nevada City.
DepartmentLine itemsBudgetShare
Wastewater12$16M42%
Sewer1$750K2%
Water Distribution16$21M56%

Project types in Nevada City's plan

Wastewater treatment plants in Nevada City

2 publicly owned treatment plants in Nevada City with 185 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Nevada City Wastewater Treatment Plant0.38CA0079901184
Cascade Shores WWTP0.0063CAC4429211

Other California cities with capital plans

Nevada City capital plan questions

Sources and methodology

Budgets and years are as published in Nevada City’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2026–2030 (29 line items).

Data refreshed September 11, 2026.