29 line items · $38M · starting 2026–2029 · 1 plan
Nevada City's published capital plans list 29 water, sewer and wastewater line items with a combined planning budget of $38M, of which 13 items worth $17M sit in the wastewater and sewer departments. The largest single item is Additional Reservoir Storage at $9M (2027–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Additional Reservoir Storage | Water Distribution | Storage tanks and reservoirs | $9M | 2027–2029 |
| 2 | Conversion to UV | Wastewater | Disinfection and UV | $6M | 2028–2029 |
| 3 | Sugarloaf Additional Water Tank | Water Distribution | Storage tanks and reservoirs | $5M | 2028–2030 |
| 4 | Biosolids Processing | Wastewater | Biosolids, sludge and dewatering | $3M | 2026–2028 |
| 5 | Emergency Wastewater Storage Basins | Wastewater | Water mains and distribution | $2M | 2028–2030 |
| 6 | Pine Street Water Main | Water Distribution | Water mains and distribution | $2M | 2026–2027 |
| 7 | Aerobic Digestor | Wastewater | Biosolids, sludge and dewatering | $1M | 2027–2029 |
| 8 | Raw Water Pipe to Cascade Canal | Water Distribution | Water mains and distribution | $1M | 2026–2027 |
| 9 | Headworks | Wastewater | Headworks, screening and grit | $800K | 2026–2027 |
| 10 | Annual Sewer Main Replacements | Sewer | Sewer rehabilitation and I&I | $750K | 2025–2030 |
19 more line items in Nevada City, with descriptions and contacts
Klarifi holds every Nevada City line item with its description, the page it appears on and the source document, plus 7 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$2M
5 items
2026
$10M
15 items
2027
$12M
4 items
2028
$14M
4 items
2029
$570K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 12 | $16M | 42% |
| Sewer | 1 | $750K | 2% |
| Water Distribution | 16 | $21M | 56% |
2 publicly owned treatment plants in Nevada City with 185 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Nevada City Wastewater Treatment Plant | 0.38 | CA0079901 | 184 |
| Cascade Shores WWTP | 0.0063 | CAC442921 | 1 |
Sources and methodology
Budgets and years are as published in Nevada City’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (29 line items).