32 line items · $89M · starting 2026–2031 · 1 plan
Pismo Beach's published capital plans list 32 water, sewer and wastewater line items with a combined planning budget of $89M, of which 15 items worth $9M sit in the wastewater and sewer departments. The largest single item is Central Coast Blue Advanced Water Purification Treatement Plant at $59M (2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Central Coast Blue Advanced Water Purification Treatement Plant | Water Supply | Water treatment plants | $59M | 2028 |
| 2 | Automated Meter Reading | Water Distribution | Meters and AMI | $5M | 2029 |
| 3 | New Production Well | Water Supply | Wells and groundwater | $4M | 2027 |
| 4 | Waterline Replacement | Water Distribution | Water mains and distribution | $4M | 2029–2035 |
| 5 | Sunset Palisades Lift Station Rehab and Relocation of Force Main in Searidge | Sewer | Lift stations | $2M | 2026 |
| 6 | Pacific Estates Reservoir Maintenance | Water Supply | Storage tanks and reservoirs | $2M | 2029–2030 |
| 7 | Bello Price/Hwy 101 Waterline Upgrade | Water Distribution | Water mains and distribution | $2M | 2031 |
| 8 | Sludge Handling Upgrades | Wastewater | Biosolids, sludge and dewatering | $2M | 2032 |
| 9 | Bello Reservoir Replacement | Water Supply | Storage tanks and reservoirs | $1M | 2028–2029 |
| 10 | CCTV Gravity Sewer Mains | Sewer | Sewer rehabilitation and I&I | $1M | 2029–2030 |
22 more line items in Pismo Beach, with descriptions and contacts
Klarifi holds every Pismo Beach line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
2026
$3M
6 items
2027
$5M
5 items
2028
$62M
7 items
2029
$12M
6 items
2030
$1M
2 items
2031
$3M
3 items
2032 and later
$2M
3 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 5 | $3M | 3% |
| Sewer | 10 | $6M | 7% |
| Water Supply | 8 | $68M | 76% |
| Water Distribution | 9 | $12M | 14% |
1 publicly owned treatment plant in Pismo Beach with 77 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Pismo Beach WWTF | 0.93 | CA0048151 | 77 |
Sources and methodology
Budgets and years are as published in Pismo Beach’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2031 (32 line items).
Data refreshed September 11, 2026.