Richmond, California: water and wastewater capital improvement projects

9 line items · $52M · 1 plan

Richmond's published capital plans list 9 water, sewer and wastewater line items with a combined planning budget of $52M, of which 8 items worth $51M sit in the wastewater and sewer departments. The largest single item is Sanitary Sewer Repairs at $19M (2025–2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Richmond

The 9 largest water, sewer and wastewater line items in Richmond’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Sanitary Sewer RepairsSewerSewer rehabilitation and I&I$19M2025–2028
2Cutting Blvd. & Harbour Way S. Sewer Line Wet Weather Improvement ProjectSewerSewer rehabilitation and I&I$14M2025
3Sanitary Sewer Pipeline RehabilitationSewerSewer rehabilitation and I&I$9M2025–2029
4WWTP Sludge ThickenerWastewaterBiosolids, sludge and dewatering$4M2025
5Dornan Drive Tunnel RehabilitationWastewaterForce mains and interceptors$3M2025
6Manhole Replacement ProjectWastewaterSewer rehabilitation and I&I$2M2025–2029
7Dornan Drive Force Main RehabilitationWater DistributionForce mains and interceptors$880K2025
8Sanitary Sewer Brick Manhole RepairsSewerSewer rehabilitation and I&I$250K2025
9Grit and Aeration ReplacementWastewaterAeration and blowers$81K2025

Descriptions, page references and contacts for Richmond

Klarifi holds every Richmond line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$52M

9 items

By department

Line items and planning budgets by department, Richmond.
DepartmentLine itemsBudgetShare
Wastewater4$8M16%
Sewer4$43M83%
Water Distribution1$880K2%

Wastewater treatment plants in Richmond

No publicly owned treatment plant is recorded under Richmond in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in California.

Other California cities with capital plans

Richmond capital plan questions

Sources and methodology

Budgets and years are as published in Richmond’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2024–2029 (9 line items).