26 line items · $98M · starting 2026 · 1 plan
Stockton's published capital plans list 26 water, sewer and wastewater line items with a combined planning budget of $98M, of which 12 items worth $15M sit in the wastewater and sewer departments. The largest single item is Water Field Office Remodel (DWTP-Campus Improvements) at $25M (2025–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Water Field Office Remodel (DWTP-Campus Improvements) | Water Supply | Buildings, HVAC and site work | $25M | 2025–2029 |
| 2 | Northeast Reservoir and Associated Pump Station | Water Supply | Pump stations | $16M | 2025–2028 |
| 3 | Advanced Metering Infrastructure | Water Supply | Meters and AMI | $12M | 2025–2028 |
| 4 | Cannery Park Water Transmission Reimbursement | Water Supply | Water mains and distribution | $7M | 2025–2027 |
| 5 | Eight Mile Road Water Line Reimbursement | Water Distribution | Water mains and distribution | $6M | 2025–2027 |
| 6 | Ground Water Recharge Basin | Water Supply | Wells and groundwater | $5M | 2025–2027 |
| 7 | Lincoln Road Sanitary Sewer Line Rehabilitation | Wastewater | Sewer rehabilitation and I&I | $5M | 2025–2026 |
| 8 | Newcastle Loop Phase 2 (Reimbursement) | Water Supply | Water mains and distribution | $5M | 2025–2028 |
| 9 | Well No. 30 Rehabilitation | Water Supply | Wells and groundwater | $3M | 2026–2027 |
| 10 | Addition Of Second Centrifuge System | Wastewater | Biosolids, sludge and dewatering | $2M | 2025–2027 |
16 more line items in Stockton, with descriptions and contacts
Klarifi holds every Stockton line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$90M
21 items
2026
$8M
5 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 12 | $15M | 16% |
| Water Supply | 13 | $77M | 79% |
| Water Distribution | 1 | $6M | 6% |
1 publicly owned treatment plant in Stockton with 57 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Stockton Rwcf | 29.2 | CA0079138 | 57 |
Sources and methodology
Budgets and years are as published in Stockton’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2030 (26 line items).
Data refreshed September 11, 2026.