Watsonville, California: water and wastewater capital improvement projects

30 line items · $154M · starting 2026–2029 · 1 plan

Watsonville's published capital plans list 30 water, sewer and wastewater line items with a combined planning budget of $154M, of which 14 items worth $83M sit in the wastewater and sewer departments. The largest single item is Chromium 6 Treatment Plants at $47M (2025–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Watsonville

The 10 largest water, sewer and wastewater line items in Watsonville’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Chromium 6 Treatment PlantsWater Supply$47M2025–2029
2Replace Headworks DiversionWastewaterHeadworks, screening and grit$37M2026–2030
3RW Switchgear, Standby GeneratorWastewaterGenerators, power and electrical$17M2027–2030
4Main Switchgear and Energy Recovery Electrical System ImprovementsWastewaterWater mains and distribution$13M2025–2027
5Water Main Replacement Material and Equipment CostsWater DistributionWater mains and distribution$8M2025–2030
6Additional(0.5 miles/year) Water Main ReplacementWater DistributionWater mains and distribution$6M2025–2029
7Sewer Pump Station Improvements - Pajaro DunesWastewaterPump stations$5M2027–2029
8Sub Basin 7 Sanitary Sewer Infrastructure Repairs Martinelli to BeachWastewaterSewer rehabilitation and I&I$3M2026–2028
9Water Meter ReplacementWater DistributionMeters and AMI$2M2025–2030
10Airport, Hames, Amesti, and Rider Tank Coating ProjectsWater DistributionStorage tanks and reservoirs$2M2025–2027

20 more line items in Watsonville, with descriptions and contacts

Klarifi holds every Watsonville line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$88M

22 items

2026

$40M

2 items

2027

$25M

5 items

2029

$885K

1 items

By department

Line items and planning budgets by department, Watsonville.
DepartmentLine itemsBudgetShare
Wastewater13$82M53%
Sewer1$500K0%
Water Supply8$51M33%
Water Distribution8$20M13%

Project types in Watsonville's plan

Wastewater treatment plants in Watsonville

1 publicly owned treatment plant in Watsonville with 8 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Watsonville WWTF5.21CA00482168

Other California cities with capital plans

Watsonville capital plan questions

Sources and methodology

Budgets and years are as published in Watsonville’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2030 (30 line items).

Data refreshed September 11, 2026.