15 line items · $16M · starting 2026–2027 · 1 plan
Woodland's published capital plans list 15 water, sewer and wastewater line items with a combined planning budget of $16M, of which 6 items worth $14M sit in the wastewater and sewer departments. The largest single item is Water Pollution Asset Replacement Project at $6M (2025–2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Water Pollution Asset Replacement Project | Wastewater | Aeration and blowers | $6M | 2025–2028 |
| 2 | Annual Sewer Repair and Replacement | Sewer | Sewer rehabilitation and I&I | $3M | 2025–2027 |
| 3 | Large Diameter Wastewater Pipeline Repair, Replacement, & Lining | Sewer | Water mains and distribution | $2M | 2025–2028 |
| 4 | Replacement of Orangeberg Sewer Laterals | Sewer | Sewer rehabilitation and I&I | $2M | 2025–2028 |
| 5 | Water Meter Replacement | Water Distribution | Meters and AMI | $800K | 2025–2028 |
| 6 | Treatment Plant Exp-Biosolids | Wastewater | Biosolids, sludge and dewatering | $770K | 2025 |
| 7 | Water System Leak Detection, Maintenance & Repairs | Water Distribution | Water mains and distribution | $700K | 2025 |
| 8 | 2026 Water and Sewer Replacement Project | Water Distribution | Sewer rehabilitation and I&I | $400K | 2025 |
| 9 | 2025 Urban Water Management Plan | Water Distribution | — | $166K | 2025 |
| 10 | Sewer System Hydraulic Model Update | Sewer | Sewer rehabilitation and I&I | $125K | 2026 |
5 more line items in Woodland, with descriptions and contacts
Klarifi holds every Woodland line item with its description, the page it appears on and the source document, plus 9 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$16M
12 items
2026
$150K
2 items
2027
$25K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 2 | $7M | 43% |
| Sewer | 4 | $7M | 43% |
| Water Supply | 1 | $25K | 0% |
| Water Distribution | 8 | $2M | 14% |
1 publicly owned treatment plant in Woodland with 2 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Woodland WPCF | 2.61 | CA0077950 | 2 |
Sources and methodology
Budgets and years are as published in Woodland’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2030 (15 line items).
Data refreshed September 11, 2026.