23 line items · $8M · starting 2026–2029 · 1 plan
Crystal River's published capital plans list 23 water, sewer and wastewater line items with a combined planning budget of $8M, of which 14 items worth $6M sit in the wastewater and sewer departments. The largest single item is Lift Station - Rehab at $2M (2025–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Lift Station - Rehab | Wastewater | Lift stations | $2M | 2025–2030 |
| 2 | Inflow & Infiltration | Wastewater | Membranes and filtration | $2M | 2025–2030 |
| 3 | Insertion Valves for System Isolation | Water Distribution | Water mains and distribution | $875K | 2025–2030 |
| 4 | Sprayfield Building | Wastewater | Buildings, HVAC and site work | $750K | 2025 |
| 5 | Emergency Repairs | Water Distribution | — | $395K | 2025–2030 |
| 6 | Spray Pump Motor Rebuild | Wastewater | Pump stations | $332K | 2025–2027 |
| 7 | Misc Line Upgrades & Service Line Replacement | Water Distribution | Water mains and distribution | $250K | 2026–2030 |
| 8 | Spare Pit Valves and Controllers | Wastewater | Water mains and distribution | $240K | 2025–2030 |
| 9 | Hwy 19 FDOT Engineering | Wastewater | — | $155K | 2025–2026 |
| 10 | Pump Upgrade | Water Supply | Pump stations | $150K | 2026 |
13 more line items in Crystal River, with descriptions and contacts
Klarifi holds every Crystal River line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$7M
13 items
2026
$630K
5 items
2027
$45K
2 items
2028
$135K
2 items
2029
$150K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 14 | $6M | 77% |
| Water Supply | 5 | $360K | 4% |
| Water Distribution | 4 | $2M | 19% |
No publicly owned treatment plant is recorded under Crystal River in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Florida.
Sources and methodology
Budgets and years are as published in Crystal River’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: Adopted Budget 2025–2026 (23 line items).