16 line items · $51M · 1 plan
Plant City's published capital plans list 16 water, sewer and wastewater line items with a combined planning budget of $51M, of which 8 items worth $35M sit in the wastewater and sewer departments. The largest single item is McIntosh Preserve Wetland Expansion at $10M (2024–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | McIntosh Preserve Wetland Expansion | Wastewater | Water treatment plants | $10M | 2024–2026 |
| 2 | Preserve Wetland Expansion | Wastewater | Water treatment plants | $9M | 2025–2026 |
| 3 | Collection System Asset Management | Sewer | Sewer rehabilitation and I&I | $9M | 2024–2028 |
| 4 | Water Capacity Improvements | Water Supply | Water mains and distribution | $7M | 2024–2029 |
| 5 | Meter Replacement / Repair Program | Water Distribution | Meters and AMI | $4M | 2024–2028 |
| 6 | Water Distribution System Asset Management | Water Distribution | Water mains and distribution | $3M | 2024–2028 |
| 7 | Wastewater/Reclaimed Water Tank Asset Management Program | Wastewater | Storage tanks and reservoirs | $3M | 2024–2029 |
| 8 | Lift Station Maintenance and Rehabilitation | Sewer | Lift stations | $2M | 2024–2028 |
| 9 | Water Reclamation Facility (WRF) Asset Management | Wastewater | Wastewater treatment plant upgrades | $2M | 2024–2028 |
| 10 | Water Reclamation Facility (WRF) Sustainability and Resiliency | Wastewater | Wastewater treatment plant upgrades | $850K | 2024–2029 |
6 more line items in Plant City, with descriptions and contacts
Klarifi holds every Plant City line item with its description, the page it appears on and the source document, plus 4 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$51M
16 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 5 | $24M | 47% |
| Sewer | 3 | $11M | 21% |
| Water Supply | 4 | $8M | 16% |
| Water Distribution | 4 | $8M | 15% |
1 publicly owned treatment plant in Plant City with 7 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Plant City WRF | 7.1 | FL0026557 | 7 |
Sources and methodology
Budgets and years are as published in Plant City’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2029 (16 line items).
Data refreshed September 11, 2026.