O Fallon, Illinois: water and wastewater capital improvement projects

21 line items · $32M · starting 2026–2029 · 1 plan

O Fallon's published capital plans list 21 water, sewer and wastewater line items with a combined planning budget of $32M, of which 8 items worth $18M sit in the wastewater and sewer departments. The largest single item is South Cherry Street Rehabilitation at $4M (2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in O Fallon

The 10 largest water, sewer and wastewater line items in O Fallon’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1South Cherry Street RehabilitationSewerSewer rehabilitation and I&I$4M2027
2Watermain Replacement ProgramWater DistributionWater mains and distribution$3M2026–2030
3Hickory and Walnut Street RehabilitationSewerSewer rehabilitation and I&I$3M2027–2028
4North Trunk Main Replacement Phase 1SewerForce mains and interceptors$2M2028–2029
5North Trunk Main Replacement Phase 2SewerForce mains and interceptors$2M2029–2030
6South Trunk Main Replacement Phase 3SewerForce mains and interceptors$2M2027–2028
7Sanitary Sewer Lining ProgramSewerSewer rehabilitation and I&I$2M2026–2030
8South Trunk Main Replacement Phase 2SewerForce mains and interceptors$2M2027
91st Street and Betty Lane RehabilitationWater DistributionStormwater and flood resilience$2M2029–2030
10Water Tower MaintenanceWater SupplyStorage tanks and reservoirs$2M2029–2030

11 more line items in O Fallon, with descriptions and contacts

Klarifi holds every O Fallon line item with its description, the page it appears on and the source document, plus 23 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

2026

$7M

5 items

2027

$15M

9 items

2028

$4M

3 items

2029

$6M

4 items

By department

Line items and planning budgets by department, O Fallon.
DepartmentLine itemsBudgetShare
Sewer8$18M56%
Water Supply2$2M5%
Water Distribution11$13M39%

Wastewater treatment plants in O Fallon

3 publicly owned treatment plants in O Fallon with 3 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
O Fallon STP1.98IL00216360
Caseyville Township East STP1.75ILL0210833
Caseyville Township West STP0.38IL00230430

Other Illinois cities with capital plans

O Fallon capital plan questions

Sources and methodology

Budgets and years are as published in O Fallon’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2026–2030 (21 line items).

Data refreshed September 11, 2026.