12 line items · $11M · starting 2027–2030 · 1 plan

Allegan's published capital plans list 12 water, sewer and wastewater line items with a combined planning budget of $11M. The largest single item is AMP-Plant at $3M (2024–2034). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Allegan

The 10 largest water, sewer and wastewater line items in Allegan’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1AMP-PlantWater Supply$3M2024–2034
2AMP/NonPipeAsset Repairs-Dist/CollWater Supply$2M2024–2034
3Dist/Coll ImprovementsWater Supply$1M2024–2027
4Lead Service ReplacementWater SupplyLead service line replacement$1M2027–2034
5Plant ImprovementsWater SupplyWastewater treatment plant upgrades$702K2024–2030
6Knapp & Academy Water Main/Road ReconstructWater SupplyWater mains and distribution$520K2032–2033
7Lake Dr & Arnold Water Main/Road ReplacementWater SupplyWater mains and distribution$442K2030–2031
8North St Water Main/Road ReplacementWater SupplyWater mains and distribution$295K2030–2031
9Davis Street Sanitary Sewer ReplacementWater SupplySewer rehabilitation and I&I$263K2030–2031
10River Crossing Sanitary Sewer ReplacementWater SupplySewer rehabilitation and I&I$220K2030–2031

2 more line items in Allegan, with descriptions and contacts

Klarifi holds every Allegan line item with its description, the page it appears on and the source document, plus 4 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$8M

4 items

2027

$1M

1 items

2030

$1M

5 items

2032 and later

$721K

2 items

By department

Line items and planning budgets by department, Allegan.
DepartmentLine itemsBudgetShare
Water Supply12$11M100%

Wastewater treatment plants in Allegan

1 publicly owned treatment plant in Allegan with 13 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Allegan WWTP0.67MI002053213

Other Michigan cities with capital plans

Allegan capital plan questions

Sources and methodology

Budgets and years are as published in Allegan’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2034 (12 line items).