16 line items · $8M · starting 2026–2027 · 1 plan
Bronson's published capital plans list 16 water, sewer and wastewater line items with a combined planning budget of $8M, of which 7 items worth $6M sit in the wastewater and sewer departments. The largest single item is System Wide Lining & Grouting Construction at $3M (2024–2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | System Wide Lining & Grouting Construction | Wastewater | — | $3M | 2024–2025 |
| 2 | Replace Both Liftstations | Wastewater | Lift stations | $3M | 2025–2026 |
| 3 | Lead Service Line Replacement | Water Distribution | Lead service line replacement | $425K | 2024–2029 |
| 4 | Replace 4" Main on Corey from Walker to Wayne | Water Distribution | Water mains and distribution | $315K | 2027–2028 |
| 5 | Explore/Study New Wellsite & Install New Well | Water Supply | Wells and groundwater | $250K | 2025–2026 |
| 6 | Collection System Repairs | Wastewater | Sewer rehabilitation and I&I | $150K | 2024–2029 |
| 7 | Distribution System Improvements (as needed) | Water Distribution | Water mains and distribution | $150K | 2024–2029 |
| 8 | Treatment Plant Upgrades (as needed) | Wastewater | Wastewater treatment plant upgrades | $150K | 2024–2029 |
| 9 | Compton Street Lead Service Line Replacements | Water Distribution | Lead service line replacement | $140K | 2024–2025 |
| 10 | Abandon 4" Portions of Main on Douglas, State St | Water Distribution | Water mains and distribution | $128K | 2027–2028 |
6 more line items in Bronson, with descriptions and contacts
Klarifi holds every Bronson line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$7M
12 items
2026
$70K
2 items
2027
$443K
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 7 | $6M | 81% |
| Water Supply | 2 | $275K | 3% |
| Water Distribution | 7 | $1M | 16% |
1 publicly owned treatment plant in Bronson with 10 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Bronson WWTP | 0.17 | MI0020729 | 10 |
Sources and methodology
Budgets and years are as published in Bronson’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: Adopted Budget 2024–2025 (16 line items).
Data refreshed September 11, 2026.