Klarifi Logo
Try for freeLog in
Klarifi Logo

Bronson, Michigan: water and wastewater capital improvement projects

16 line items · $8M · starting 2026–2027 · 1 plan

Bronson's published capital plans list 16 water, sewer and wastewater line items with a combined planning budget of $8M, of which 7 items worth $6M sit in the wastewater and sewer departments. The largest single item is System Wide Lining & Grouting Construction at $3M (2024–2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Bronson

The 10 largest water, sewer and wastewater line items in Bronson’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1System Wide Lining & Grouting ConstructionWastewater$3M2024–2025
2Replace Both LiftstationsWastewaterLift stations$3M2025–2026
3Lead Service Line ReplacementWater DistributionLead service line replacement$425K2024–2029
4Replace 4" Main on Corey from Walker to WayneWater DistributionWater mains and distribution$315K2027–2028
5Explore/Study New Wellsite & Install New WellWater SupplyWells and groundwater$250K2025–2026
6Collection System RepairsWastewaterSewer rehabilitation and I&I$150K2024–2029
7Distribution System Improvements (as needed)Water DistributionWater mains and distribution$150K2024–2029
8Treatment Plant Upgrades (as needed)WastewaterWastewater treatment plant upgrades$150K2024–2029
9Compton Street Lead Service Line ReplacementsWater DistributionLead service line replacement$140K2024–2025
10Abandon 4" Portions of Main on Douglas, State StWater DistributionWater mains and distribution$128K2027–2028

6 more line items in Bronson, with descriptions and contacts

Klarifi holds every Bronson line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$7M

12 items

2026

$70K

2 items

2027

$443K

2 items

By department

Line items and planning budgets by department, Bronson.
DepartmentLine itemsBudgetShare
Wastewater7$6M81%
Water Supply2$275K3%
Water Distribution7$1M16%

Project types in Bronson's plan

Wastewater treatment plants in Bronson

1 publicly owned treatment plant in Bronson with 10 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Bronson WWTP0.17MI002072910

Other Michigan cities with capital plans

Bronson capital plan questions

Sources and methodology

Budgets and years are as published in Bronson’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: Adopted Budget 2024–2025 (16 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free