84 line items · $44M · starting 2026–2031 · 2 plans
Brooklyn's published capital plans list 84 water, sewer and wastewater line items with a combined planning budget of $44M, of which 37 items worth $18M sit in the wastewater and sewer departments. The largest single item is Well No. 11: Well and Pumphouse at $3M (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Well No. 11: Well and Pumphouse | Water Distribution | Wells and groundwater | $3M | 2025 |
| 2 | Garden City North Area Mill and Overlay | Water Distribution | Water mains and distribution | $3M | 2030 |
| 3 | Orchard Lane West Area Improvements | Sewer | Sewer rehabilitation and I&I | $2M | 2026 |
| 4 | Water Meter Full System Replacement | Water Distribution | Meters and AMI | $2M | 2028 |
| 5 | Riverwood Area Improvements | Water Distribution | — | $2M | 2036 |
| 6 | Twin Lake North Area Mill and Overlay | Water Distribution | Water mains and distribution | $2M | 2037 |
| 7 | Xerxes and Northway Area Improvements | Water Distribution | — | $2M | 2037 |
| 8 | Sanitary Sewer Lining (Miss. River Trunk N. of I-694 to 70th/Willow) | Sewer | Sewer rehabilitation and I&I | $2M | 2030 |
| 9 | Riverwood Area Improvements | Sewer | — | $2M | 2036 |
| 10 | Southwest Area Mill and Overlay | Water Distribution | Water mains and distribution | $1M | 2031 |
74 more line items in Brooklyn, with descriptions and contacts
Klarifi holds every Brooklyn line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$4M
3 items
2026
$4M
13 items
2027
$4M
11 items
2028
$4M
12 items
2029
$4M
4 items
2030
$7M
6 items
2031
$2M
4 items
2032 and later
$17M
31 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 37 | $18M | 41% |
| Water Supply | 1 | $240K | 1% |
| Water Distribution | 46 | $26M | 59% |
1 publicly owned treatment plant in Brooklyn with 1 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Lenawee Cdc-Wamplers Lk Wwsl | — | MIG580392 | 1 |
Sources and methodology
Budgets and years are as published in Brooklyn’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2031 (82 line items); CIP 2024–2029 (2 line items).
Data refreshed September 11, 2026.