18 line items · $670K · 1 plan
Coopersville's published capital plans list 18 water, sewer and wastewater line items with a combined planning budget of $670K, of which 9 items worth $238K sit in the wastewater and sewer departments. The largest single item is Hydrant Parts at $145K (2024–2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Hydrant Parts | Water Supply | Water mains and distribution | $145K | 2024–2025 |
| 2 | Lead Line Investigations/Replacements | Water Supply | Lead service line replacement | $90K | 2024–2025 |
| 3 | General Maintenance & Breaks | Water Supply | — | $75K | 2024–2025 |
| 4 | Water Valve/Curb Stop Box Repair Parts | Water Supply | Water mains and distribution | $66K | 2024–2025 |
| 5 | Treatment Plant Repairs | Wastewater | — | $60K | 2024–2025 |
| 6 | Sewer Emergencies | Wastewater | Sewer rehabilitation and I&I | $55K | 2024–2025 |
| 7 | Sewer Line Cleaning | Sewer | Sewer rehabilitation and I&I | $40K | 2024–2025 |
| 8 | General Maintenance & Repairs | Water Supply | — | $30K | 2024–2025 |
| 9 | Generator Maintenance & Repairs | Wastewater | Generators, power and electrical | $21K | 2024–2025 |
| 10 | Grinder Pumps | Wastewater | Pump stations | $20K | 2024–2025 |
8 more line items in Coopersville, with descriptions and contacts
Klarifi holds every Coopersville line item with its description, the page it appears on and the source document, plus 9 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$670K
18 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 8 | $198K | 30% |
| Sewer | 1 | $40K | 6% |
| Water Supply | 9 | $432K | 64% |
1 publicly owned treatment plant in Coopersville with 3 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Coopersville WWTP | 1.94 | MI0022730 | 3 |
Sources and methodology
Budgets and years are as published in Coopersville’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: Adopted Budget 2024–2025 (18 line items).