11 line items · $6M · starting 2026–2029 · 1 plan
Imlay City's published capital plans list 11 water, sewer and wastewater line items with a combined planning budget of $6M, of which 6 items worth $3M sit in the wastewater and sewer departments. The largest single item is Fourth Street (Sewer Portion) at $1M (2024–2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Fourth Street (Sewer Portion) | Sewer | Sewer rehabilitation and I&I | $1M | 2024–2025 |
| 2 | Fourth Street (Water Portion) | Water Distribution | Water mains and distribution | $1M | 2024–2025 |
| 3 | Lead Service Lines (Water Portion) | Water Distribution | Lead service line replacement | $1M | 2025–2026 |
| 4 | S. Almont Ave Water Main (Water Portion) | Water Distribution | Water mains and distribution | $700K | 2025–2026 |
| 5 | Clarifiers | Sewer | Clarifiers and settling | $500K | 2025–2026 |
| 6 | E. Second Street (Water Portion) | Water Distribution | Water mains and distribution | $500K | 2029–2030 |
| 7 | E. Second Street (Water Portion) | Sewer | Sewer rehabilitation and I&I | $400K | 2029–2030 |
| 8 | Water Meter Replacement Program (Sewer Portion) | Sewer | Sewer rehabilitation and I&I | $350K | 2024–2026 |
| 9 | Water Meter Replacement Program (Water Portion) | Water Distribution | Meters and AMI | $350K | 2024–2026 |
| 10 | Raw Pump | Sewer | Pump stations | $250K | 2027–2028 |
1 more line items in Imlay City, with descriptions and contacts
Klarifi holds every Imlay City line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$5M
7 items
2026
$100K
1 items
2027
$250K
1 items
2029
$900K
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 6 | $3M | 42% |
| Water Distribution | 5 | $4M | 58% |
1 publicly owned treatment plant in Imlay City with 3 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Imlay City WWTP | 0.29 | MI0023167 | 3 |
Sources and methodology
Budgets and years are as published in Imlay City’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2030 (11 line items).
Data refreshed September 11, 2026.