Lexington, Michigan: water and wastewater capital improvement projects

13 line items · $12M · starting 2026–2027 · 1 plan

Lexington's published capital plans list 13 water, sewer and wastewater line items with a combined planning budget of $12M, of which 4 items worth $4M sit in the wastewater and sewer departments. The largest single item is Water Filtration Plant Rehab at $5M (2025–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Lexington

The 10 largest water, sewer and wastewater line items in Lexington’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Water Filtration Plant RehabWater SupplyMembranes and filtration$5M2025–2027
2Gravity Sewer RehabilitationSewerSewer rehabilitation and I&I$3M2024–2027
3Water Main Replacement 3‐6Water DistributionWater mains and distribution$1M2024–2027
4New Water Storage TankWater SupplyStorage tanks and reservoirs$1M2025–2027
5Boynton Lift Station Force MainSewerLift stations$1M2024–2027
6Lagoon RehabSewerLagoons and ponds$325K2024–2025
7West End Booster Station NewWater SupplyPump stations$250K2027–2028
8Huron Lift Station RehabSewerLift stations$250K2024–2027
9West End Booster Station ExistWater SupplyPump stations$163K2026–2027
10Intake/Low Lift UpgradesWater Supply$156K2026–2027

3 more line items in Lexington, with descriptions and contacts

Klarifi holds every Lexington line item with its description, the page it appears on and the source document, plus 8 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$12M

8 items

2026

$319K

2 items

2027

$406K

3 items

By department

Line items and planning budgets by department, Lexington.
DepartmentLine itemsBudgetShare
Sewer4$4M36%
Water Supply6$7M53%
Water Distribution3$1M11%

Wastewater treatment plants in Lexington

1 publicly owned treatment plant in Lexington with 13 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Lexington WwslMIG58035613

Other Michigan cities with capital plans

Lexington capital plan questions

Sources and methodology

Budgets and years are as published in Lexington’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2024–2030 (13 line items).

Data refreshed September 11, 2026.