22 line items · $4M · starting 2026–2029 · 1 plan
Middleville's published capital plans list 22 water, sewer and wastewater line items with a combined planning budget of $4M, of which 12 items worth $2M sit in the wastewater and sewer departments. The largest single item is Sewer Main Lining/Replacement; Manhole at $1M (2025–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Sewer Main Lining/Replacement; Manhole | Sewer | Sewer rehabilitation and I&I | $1M | 2025–2029 |
| 2 | M-37: Main St to Arlington Water Main Replacement | Water Distribution | Water mains and distribution | $700K | 2026 |
| 3 | Lead Service Replacements | Water Supply | Lead service line replacement | $300K | 2025–2028 |
| 4 | Replace Water Main Under River (W Railroad St) | Water Distribution | Water mains and distribution | $300K | 2026 |
| 5 | Fremont St. from High St. to Grand Rapids Water Main Replacement | Water Distribution | Water mains and distribution | $250K | 2028 |
| 6 | GR Lift Station Upgrades | Sewer | Lift stations | $250K | 2026 |
| 7 | State Street Lift Station Development | Sewer | Lift stations | $250K | 2025 |
| 8 | Dibble& Paul St. Water Main Replacement | Water Distribution | Water mains and distribution | $200K | 2027 |
| 9 | Fremont St. from High St. to Grand Rapids St.Sewer Replacement | Sewer | Sewer rehabilitation and I&I | $170K | 2028 |
| 10 | Bender Rd Water Tower Maintenance Contract | Water Supply | Storage tanks and reservoirs | $160K | 2025–2029 |
12 more line items in Middleville, with descriptions and contacts
Klarifi holds every Middleville line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$2M
11 items
2026
$1M
3 items
2027
$300K
2 items
2028
$612K
5 items
2029
$30K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 12 | $2M | 55% |
| Water Supply | 6 | $549K | 12% |
| Water Distribution | 4 | $1M | 33% |
1 publicly owned treatment plant in Middleville. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Thornapple Twp-Duncan Lk Wwsl | — | MIG580104 | 0 |
Sources and methodology
Budgets and years are as published in Middleville’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2023–2029 (22 line items).
Data refreshed September 11, 2026.