Mount Pleasant, Michigan: water and wastewater capital improvement projects

70 line items · $16M · starting 2026–2030 · 1 plan

Mount Pleasant's published capital plans list 70 water, sewer and wastewater line items with a combined planning budget of $16M, of which 18 items worth $3M sit in the wastewater and sewer departments. The largest single item is Lime Residual Removal at $2M (2025–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Mount Pleasant

The 10 largest water, sewer and wastewater line items in Mount Pleasant’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Lime Residual RemovalWater SupplyLagoons and ponds$2M2025–2029
2Remove 10,000 YdsWater SupplyLagoons and ponds$2M2025–2029
3Facility Improvements and ReplacementsWater Supply$1M2025–2030
4Distribution System ReplacementWater SupplyWater mains and distribution$1M2025–2030
5Lift Station Improvements and ReplacementsWater SupplyLift stations$682K2025–2030
6Raw Water ReservoirWater SupplyStorage tanks and reservoirs$650K2029
7Meter ReplacementWater SupplyMeters and AMI$396K2025–2029
8Replacement of water meters per meter rotation plan.WastewaterMeters and AMI$396K2025–2030
9Source Water Equipment RehabilitationWater SupplyVehicles and equipment$386K2026–2028
10Upgrade facility HVAC systemWastewaterBuildings, HVAC and site work$330K2027

60 more line items in Mount Pleasant, with descriptions and contacts

Klarifi holds every Mount Pleasant line item with its description, the page it appears on and the source document, plus 28 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$9M

23 items

2026

$2M

15 items

2027

$1M

7 items

2028

$1M

11 items

2029

$2M

10 items

2030

$558K

4 items

By department

Line items and planning budgets by department, Mount Pleasant.
DepartmentLine itemsBudgetShare
Wastewater18$3M17%
Water Supply52$13M83%

Project types in Mount Pleasant's plan

Wastewater treatment plants in Mount Pleasant

2 publicly owned treatment plants in Mount Pleasant with 22 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Mt Pleasant WWTP1.88MI002365518
Isabella Reservation WWTP0.33MI00548614

Other Michigan cities with capital plans

Mount Pleasant capital plan questions

Sources and methodology

Budgets and years are as published in Mount Pleasant’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2030 (70 line items).

Data refreshed September 11, 2026.