18 line items · $22M · starting 2026–2029 · 1 plan

Sparta's published capital plans list 18 water, sewer and wastewater line items with a combined planning budget of $22M, of which 7 items worth $19M sit in the wastewater and sewer departments. The largest single item is WWTP Rehibilitation at $15M (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Sparta

The 10 largest water, sewer and wastewater line items in Sparta’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1WWTP RehibilitationWastewaterWastewater treatment plant upgrades$15M2025
21 Sanitary pipe on E Gardner from Union to WWTPSewerWastewater treatment plant upgrades$4M2025
3Replace Water Main from Well 4 to Water Treatment PlantWater DistributionWater treatment plants$650K2026
4Water Main Loop Martindale to 12 MileWater DistributionWater mains and distribution$600K2028
5Replace Water Main on S Union between Silvercreek and SpartanWater DistributionWater mains and distribution$586K2029
6Replace WM on Gardner from Martindale to WWTPWater DistributionWastewater treatment plant upgrades$420K2029
7All Tower RecommendationsWater SupplyStorage tanks and reservoirs$135K2026–2028
8Replace 4" Cl Main on ClarkWater DistributionWater mains and distribution$102K2027
9Main Improvements from Orchard to PineSewerWater mains and distribution$79K2025
10Nelson LoopWater Distribution$72K2027

8 more line items in Sparta, with descriptions and contacts

Klarifi holds every Sparta line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$19M

7 items

2026

$922K

5 items

2027

$174K

2 items

2028

$600K

1 items

2029

$1M

3 items

By department

Line items and planning budgets by department, Sparta.
DepartmentLine itemsBudgetShare
Wastewater1$15M69%
Sewer6$4M18%
Water Supply4$221K1%
Water Distribution7$2M11%

Project types in Sparta's plan

Wastewater treatment plants in Sparta

1 publicly owned treatment plant in Sparta with 7 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Sparta WWTP0.47MI00204787

Other Michigan cities with capital plans

Sparta capital plan questions

Sources and methodology

Budgets and years are as published in Sparta’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2024–2029 (18 line items).

Data refreshed September 11, 2026.

Try Klarifi for free