Klarifi Logo
Try for freeLog in
Klarifi Logo

Saint Joseph, Missouri: water and wastewater capital improvement projects

11 line items · $15M · starting 2026 · 1 plan

Saint Joseph's published capital plans list 11 water, sewer and wastewater line items with a combined planning budget of $15M, of which 11 items worth $15M sit in the wastewater and sewer departments. The largest single item is CMOM Consolidated Repairs at $10M (2024–2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Saint Joseph

The 10 largest water, sewer and wastewater line items in Saint Joseph’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1CMOM Consolidated RepairsSewer$10M2024–2028
2Sewer Vehicle ReplacementSewerSewer rehabilitation and I&I$2M2024–2028
3TV VanSewerVehicles and equipment$725K2026–2027
4Sewer Maint VactorSewerSewer rehabilitation and I&I$540K2025–2026
5Rolling Stock Sewer MaintSewerSewer rehabilitation and I&I$500K2025–2026
6Pump Motor Repalce-HEWastewaterPump stations$443K2024–2025
7Lab Equipment WPWastewaterBuildings, HVAC and site work$150K2024–2025
8Rolling Stock PickupsSewerVehicles and equipment$140K2025–2027
9GPS equipmentSewerVehicles and equipment$100K2024–2028
10Water Quality Education ProgramWastewater$75K2024–2027

1 more line items in Saint Joseph, with descriptions and contacts

Klarifi holds every Saint Joseph line item with its description, the page it appears on and the source document, plus 4 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$14M

10 items

2026

$725K

1 items

By department

Line items and planning budgets by department, Saint Joseph.
DepartmentLine itemsBudgetShare
Wastewater3$668K5%
Sewer8$14M95%

Wastewater treatment plants in Saint Joseph

1 publicly owned treatment plant in Saint Joseph with 4 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
St. Joseph Water Protection Facility18.27MO00230434

Other Missouri cities with capital plans

Saint Joseph capital plan questions

Sources and methodology

Budgets and years are as published in Saint Joseph’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2022–2028 (11 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free