Warrensburg, Missouri: water and wastewater capital improvement projects

12 line items · $26M · 1 plan

Warrensburg's published capital plans list 12 water, sewer and wastewater line items with a combined planning budget of $26M, of which 12 items worth $26M sit in the wastewater and sewer departments. The largest single item is East and West Sewer Plant Expansions at $22M (2024–2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Warrensburg

The 10 largest water, sewer and wastewater line items in Warrensburg’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1East and West Sewer Plant ExpansionsWastewaterWastewater treatment plant upgrades$22M2024–2025
2Sanitary Sewer Work on Maguire StreetSewerSewer rehabilitation and I&I$3M2024–2025
3Jet TruckSewerVehicles and equipment$350K2024–2025
4Manhole Rehabilitation and ReplacementSewerSewer rehabilitation and I&I$259K2024–2029
5New Camera Truck w/ CameraSewerVehicles and equipment$258K2025–2026
6I/I ProgramSewerSewer rehabilitation and I&I$205K2024–2029
7Vehicles - Proj Mgr and Admin TruckWastewaterVehicles and equipment$100K2025–2026
8Countertop for Lab or East PlantWastewaterBuildings, HVAC and site work$50K2025–2027
9Mini ExcavatorWastewaterVehicles and equipment$35K2025–2026
10Flex Wing MowerWastewaterVehicles and equipment$30K2025–2026

2 more line items in Warrensburg, with descriptions and contacts

Klarifi holds every Warrensburg line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$26M

12 items

By department

Line items and planning budgets by department, Warrensburg.
DepartmentLine itemsBudgetShare
Wastewater6$22M85%
Sewer6$4M15%

Wastewater treatment plants in Warrensburg

2 publicly owned treatment plants in Warrensburg. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Warrensburg West WWTP0.73MO00559050
Warrensburg East WWTP0.71MO00945790

Other Missouri cities with capital plans

Warrensburg capital plan questions

Sources and methodology

Budgets and years are as published in Warrensburg’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2024–2029 (12 line items).

Data refreshed September 11, 2026.