12 line items · $26M · 1 plan
Warrensburg's published capital plans list 12 water, sewer and wastewater line items with a combined planning budget of $26M, of which 12 items worth $26M sit in the wastewater and sewer departments. The largest single item is East and West Sewer Plant Expansions at $22M (2024–2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | East and West Sewer Plant Expansions | Wastewater | Wastewater treatment plant upgrades | $22M | 2024–2025 |
| 2 | Sanitary Sewer Work on Maguire Street | Sewer | Sewer rehabilitation and I&I | $3M | 2024–2025 |
| 3 | Jet Truck | Sewer | Vehicles and equipment | $350K | 2024–2025 |
| 4 | Manhole Rehabilitation and Replacement | Sewer | Sewer rehabilitation and I&I | $259K | 2024–2029 |
| 5 | New Camera Truck w/ Camera | Sewer | Vehicles and equipment | $258K | 2025–2026 |
| 6 | I/I Program | Sewer | Sewer rehabilitation and I&I | $205K | 2024–2029 |
| 7 | Vehicles - Proj Mgr and Admin Truck | Wastewater | Vehicles and equipment | $100K | 2025–2026 |
| 8 | Countertop for Lab or East Plant | Wastewater | Buildings, HVAC and site work | $50K | 2025–2027 |
| 9 | Mini Excavator | Wastewater | Vehicles and equipment | $35K | 2025–2026 |
| 10 | Flex Wing Mower | Wastewater | Vehicles and equipment | $30K | 2025–2026 |
2 more line items in Warrensburg, with descriptions and contacts
Klarifi holds every Warrensburg line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$26M
12 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 6 | $22M | 85% |
| Sewer | 6 | $4M | 15% |
2 publicly owned treatment plants in Warrensburg. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Warrensburg West WWTP | 0.73 | MO0055905 | 0 |
| Warrensburg East WWTP | 0.71 | MO0094579 | 0 |
Sources and methodology
Budgets and years are as published in Warrensburg’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2029 (12 line items).