23 line items · $5M · starting 2026–2028 · 1 plan
Solon's published capital plans list 23 water, sewer and wastewater line items with a combined planning budget of $5M, of which 17 items worth $3M sit in the wastewater and sewer departments. The largest single item is Cambridge Pump Station Construction at $1M (2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Cambridge Pump Station Construction | Water Supply | Pump stations | $1M | 2028 |
| 2 | Forest Lane Pump Station Construction | Sewer | Pump stations | $1M | 2027 |
| 3 | Primary Effluent Pump Replacement | Wastewater | Pump stations | $500K | 2025 |
| 4 | Ashbrook Press Rebuild | Water Distribution | — | $300K | 2026 |
| 5 | Parking lot Pavement Replacement | Wastewater | Buildings, HVAC and site work | $300K | 2026 |
| 6 | Cambridge Pump Station Upgrade Design | Water Supply | Pump stations | $250K | 2027 |
| 7 | Forest Lane Pump Station Upgrade Design | Sewer | Pump stations | $250K | 2026 |
| 8 | Northeast Force Main Replacement Design | Water Distribution | Force mains and interceptors | $250K | 2028 |
| 9 | Clarifier #4 Rebuild | Wastewater | Clarifiers and settling | $200K | 2026 |
| 10 | Storage Tank Mixers Replacement | Wastewater | Storage tanks and reservoirs | $150K | 2027 |
13 more line items in Solon, with descriptions and contacts
Klarifi holds every Solon line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$785K
7 items
2026
$1M
8 items
2027
$2M
5 items
2028
$1M
3 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 13 | $2M | 33% |
| Sewer | 4 | $1M | 29% |
| Water Supply | 4 | $1M | 27% |
| Water Distribution | 2 | $550K | 11% |
1 publicly owned treatment plant in Solon with 3 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| City Of Solon Water Reclamation Facility | 2.69 | OH0027430 | 3 |
Sources and methodology
Budgets and years are as published in Solon’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2028 (23 line items).