Solon, Ohio: water and wastewater capital improvement projects

23 line items · $5M · starting 2026–2028 · 1 plan

Solon's published capital plans list 23 water, sewer and wastewater line items with a combined planning budget of $5M, of which 17 items worth $3M sit in the wastewater and sewer departments. The largest single item is Cambridge Pump Station Construction at $1M (2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Solon

The 10 largest water, sewer and wastewater line items in Solon’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Cambridge Pump Station ConstructionWater SupplyPump stations$1M2028
2Forest Lane Pump Station ConstructionSewerPump stations$1M2027
3Primary Effluent Pump ReplacementWastewaterPump stations$500K2025
4Ashbrook Press RebuildWater Distribution$300K2026
5Parking lot Pavement ReplacementWastewaterBuildings, HVAC and site work$300K2026
6Cambridge Pump Station Upgrade DesignWater SupplyPump stations$250K2027
7Forest Lane Pump Station Upgrade DesignSewerPump stations$250K2026
8Northeast Force Main Replacement DesignWater DistributionForce mains and interceptors$250K2028
9Clarifier #4 RebuildWastewaterClarifiers and settling$200K2026
10Storage Tank Mixers ReplacementWastewaterStorage tanks and reservoirs$150K2027

13 more line items in Solon, with descriptions and contacts

Klarifi holds every Solon line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$785K

7 items

2026

$1M

8 items

2027

$2M

5 items

2028

$1M

3 items

By department

Line items and planning budgets by department, Solon.
DepartmentLine itemsBudgetShare
Wastewater13$2M33%
Sewer4$1M29%
Water Supply4$1M27%
Water Distribution2$550K11%

Project types in Solon's plan

Wastewater treatment plants in Solon

1 publicly owned treatment plant in Solon with 3 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
City Of Solon Water Reclamation Facility2.69OH00274303

Other Ohio cities with capital plans

Solon capital plan questions

Sources and methodology

Budgets and years are as published in Solon’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2024–2028 (23 line items).

Data refreshed September 11, 2026.