61 line items · $48M · starting 2026–2030 · 1 plan
Milwaukie's published capital plans list 61 water, sewer and wastewater line items with a combined planning budget of $48M, of which 20 items worth $9M sit in the wastewater and sewer departments. The largest single item is New Storage Reservoir at $9M (2026–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | New Storage Reservoir | Water Supply | Storage tanks and reservoirs | $9M | 2026–2030 |
| 2 | Water Treatment Plant | Water Supply | Water treatment plants | $8M | 2025–2029 |
| 3 | Stanley Reservoir Improvements | Water Supply | Storage tanks and reservoirs | $3M | 2025 |
| 4 | Waverly Heights Sewer System Reconfiguration | Wastewater | Sewer rehabilitation and I&I | $2M | 2025–2026 |
| 5 | Water Transmission Main Replacement | Water Supply | Water mains and distribution | $2M | 2030 |
| 6 | Water Transfer Pump Upgrades | Water Supply | Pump stations | $2M | 2027–2028 |
| 7 | Harvey Street Improvements | Water Distribution | Water mains and distribution | $2M | 2025 |
| 8 | Logus Road, 40th & 42nd Avenue | Water Distribution | Water mains and distribution | $2M | 2026–2028 |
| 9 | Sewer Lining Projects | Wastewater | Sewer rehabilitation and I&I | $1M | 2025 |
| 10 | 3rd Zone Pump Station Improvements | Water Distribution | Pump stations | $1M | 2027–2029 |
51 more line items in Milwaukie, with descriptions and contacts
Klarifi holds every Milwaukie line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$25M
28 items
2026
$11M
7 items
2027
$4M
8 items
2028
$840K
2 items
2029
$4M
9 items
2030
$4M
7 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 18 | $9M | 19% |
| Sewer | 2 | $225K | 0% |
| Water Supply | 21 | $27M | 55% |
| Water Distribution | 20 | $13M | 26% |
1 publicly owned treatment plant in Milwaukie with 3 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Oak Lodge Water Reclamation Facility | 1.74 | OR0026140 | 3 |
Sources and methodology
Budgets and years are as published in Milwaukie’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2030 (61 line items).