25 line items · $79M · starting 2026–2031 · 1 plan
Creswell's published capital plans list 25 water, sewer and wastewater line items with a combined planning budget of $79M, of which 14 items worth $75M sit in the wastewater and sewer departments. The largest single item is Membrane Bioreactor Plant at $65M (2026–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Membrane Bioreactor Plant | Wastewater | Aeration and blowers | $65M | 2026–2029 |
| 2 | Slip Lining Wastewater Infrastructure | Wastewater | — | $6M | 2024–2028 |
| 3 | Transmission Line Relocation | Water Distribution | Water mains and distribution | $2M | 2024–2026 |
| 4 | Highway 99 North Sewer Expansion | Sewer | Sewer rehabilitation and I&I | $750K | 2031 |
| 5 | D St. Improvments | Water Distribution | — | $730K | 2031 |
| 6 | 6th Street Sewer Expansion | Sewer | Sewer rehabilitation and I&I | $500K | 2031 |
| 7 | Water Distribution Lines - Airport | Water Distribution | Water mains and distribution | $450K | 2024–2025 |
| 8 | Alley Trunk Sewer 1st and Front | Sewer | Force mains and interceptors | $424K | 2031 |
| 9 | D St. Improvements | Sewer | — | $413K | 2031 |
| 10 | Modules (3 racks of 12 each) | Water Supply | — | $410K | 2025–2031 |
15 more line items in Creswell, with descriptions and contacts
Klarifi holds every Creswell line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$10M
14 items
2026
$65M
1 items
2027
$365K
1 items
2031
$4M
9 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 4 | $71M | 90% |
| Sewer | 10 | $4M | 4% |
| Water Supply | 6 | $1M | 1% |
| Water Distribution | 5 | $3M | 4% |
1 publicly owned treatment plant in Creswell with 42 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Creswell STP | 0.35 | OR0027545 | 42 |
Sources and methodology
Budgets and years are as published in Creswell’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2026 (25 line items).
Data refreshed September 11, 2026.