Salem, Oregon: water and wastewater capital improvement projects

68 line items · $166M · starting 2026–2029 · 2 plans

Salem's published capital plans list 68 water, sewer and wastewater line items with a combined planning budget of $166M, of which 33 items worth $78M sit in the wastewater and sewer departments. The largest single item is Willow Lake Water Pollution Control Facility (WPCF) - South Secondary Clarifiers at $13M (2027–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Salem

The 10 largest water, sewer and wastewater line items in Salem’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Willow Lake Water Pollution Control Facility (WPCF) - South Secondary ClarifiersWastewaterClarifiers and settling$13M2027–2029
2Geren Island Access Bridge RepairsWater SupplyWastewater treatment plant upgrades$12M2026–2029
3Willow Lake Water Pollution Control Facility (WPCF) South Primary Clarifier ImprovementsWastewaterClarifiers and settling$10M2027–2030
4Franzen Reservoir Cover and Liner ReplacementWater DistributionStorage tanks and reservoirs$8M2026–2027
5Miscellaneous Wastewater System Rehabilitation and Replacement ProjectsWastewaterSewer rehabilitation and I&I$8M2026–2030
6Miscellaneous Water System Rehabilitation and Replacement ProjectsWater SupplyWater mains and distribution$8M2026–2030
7Geren Island Filter(s) Resanding ProgramWater SupplyMembranes and filtration$8M2026–2030
812th Street SE Waterline Replacement - Rural Avenue SE to Oak Street SEWater DistributionWater mains and distribution$7M2027–2030
9Fairmount Reservoir Seismic UpgradesWater SupplyStorage tanks and reservoirs$7M2028–2029
10Franzen Reservoir Cover and Liner ReplacementWater DistributionStorage tanks and reservoirs$5M2026

58 more line items in Salem, with descriptions and contacts

Klarifi holds every Salem line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$16M

14 items

2026

$93M

37 items

2027

$38M

9 items

2028

$14M

4 items

2029

$5M

4 items

By department

Line items and planning budgets by department, Salem.
DepartmentLine itemsBudgetShare
Wastewater15$44M26%
Sewer18$34M21%
Water Supply18$55M33%
Water Distribution17$33M20%

Project types in Salem's plan

Wastewater treatment plants in Salem

1 publicly owned treatment plant in Salem with 2 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Willow Lake WWTP24.62ORL0264092

Other Oregon cities with capital plans

Salem capital plan questions

Sources and methodology

Budgets and years are as published in Salem’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2026–2030 (44 line items); Adopted Budget 2026 (24 line items).

Data refreshed September 11, 2026.