68 line items · $166M · starting 2026–2029 · 2 plans
Salem's published capital plans list 68 water, sewer and wastewater line items with a combined planning budget of $166M, of which 33 items worth $78M sit in the wastewater and sewer departments. The largest single item is Willow Lake Water Pollution Control Facility (WPCF) - South Secondary Clarifiers at $13M (2027–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Willow Lake Water Pollution Control Facility (WPCF) - South Secondary Clarifiers | Wastewater | Clarifiers and settling | $13M | 2027–2029 |
| 2 | Geren Island Access Bridge Repairs | Water Supply | Wastewater treatment plant upgrades | $12M | 2026–2029 |
| 3 | Willow Lake Water Pollution Control Facility (WPCF) South Primary Clarifier Improvements | Wastewater | Clarifiers and settling | $10M | 2027–2030 |
| 4 | Franzen Reservoir Cover and Liner Replacement | Water Distribution | Storage tanks and reservoirs | $8M | 2026–2027 |
| 5 | Miscellaneous Wastewater System Rehabilitation and Replacement Projects | Wastewater | Sewer rehabilitation and I&I | $8M | 2026–2030 |
| 6 | Miscellaneous Water System Rehabilitation and Replacement Projects | Water Supply | Water mains and distribution | $8M | 2026–2030 |
| 7 | Geren Island Filter(s) Resanding Program | Water Supply | Membranes and filtration | $8M | 2026–2030 |
| 8 | 12th Street SE Waterline Replacement - Rural Avenue SE to Oak Street SE | Water Distribution | Water mains and distribution | $7M | 2027–2030 |
| 9 | Fairmount Reservoir Seismic Upgrades | Water Supply | Storage tanks and reservoirs | $7M | 2028–2029 |
| 10 | Franzen Reservoir Cover and Liner Replacement | Water Distribution | Storage tanks and reservoirs | $5M | 2026 |
58 more line items in Salem, with descriptions and contacts
Klarifi holds every Salem line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$16M
14 items
2026
$93M
37 items
2027
$38M
9 items
2028
$14M
4 items
2029
$5M
4 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 15 | $44M | 26% |
| Sewer | 18 | $34M | 21% |
| Water Supply | 18 | $55M | 33% |
| Water Distribution | 17 | $33M | 20% |
1 publicly owned treatment plant in Salem with 2 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Willow Lake WWTP | 24.62 | ORL026409 | 2 |
Sources and methodology
Budgets and years are as published in Salem’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (44 line items); Adopted Budget 2026 (24 line items).
Data refreshed September 11, 2026.