12 line items · $49M · starting 2026–2031 · 1 plan
Astoria's published capital plans list 12 water, sewer and wastewater line items with a combined planning budget of $49M, of which 4 items worth $25M sit in the wastewater and sewer departments. The largest single item is Sanitary Sewer Pipe Interceptor Comprehensive Evaluation (including cleaning)and Replacement/Rehabilitation Project at $10M (2030–2034). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Sanitary Sewer Pipe Interceptor Comprehensive Evaluation (including cleaning)and Replacement/Rehabilitation Project | Wastewater | Force mains and interceptors | $10M | 2030–2034 |
| 2 | WWTP Headworks Improvements Project | Wastewater | Headworks, screening and grit | $10M | 2023–2026 |
| 3 | Clearwell and Laboratory at the Water Treatment Plant | Water Supply | Water treatment plants | $6M | 2028 |
| 4 | Little Bear Creek Waterline Resilience Project | Water Supply | Stormwater and flood resilience | $5M | 2030 |
| 5 | Bear Creek Dam Emergency Spillway Project | Water Supply | — | $4M | 2034 |
| 6 | Sewage Lift Stations Rehabilitation Project | Wastewater | Lift stations | $4M | 2025–2026 |
| 7 | Pipeline Road Waterline Resilience Project | Water Distribution | Stormwater and flood resilience | $3M | 2023–2026 |
| 8 | 16th St Distribution Waterline Replacement Project | Water Distribution | Water mains and distribution | $3M | 2023–2026 |
| 9 | Irving Ave. (20th ‐ 28th St.) Waterline Resiliency Project | Water Distribution | Stormwater and flood resilience | $2M | 2026–2027 |
| 10 | Wastewater Collection System Assessment & Master Plan | Wastewater | Sewer rehabilitation and I&I | $2M | 2028 |
2 more line items in Astoria, with descriptions and contacts
Klarifi holds every Astoria line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$19M
4 items
2026
$2M
1 items
2027
$600K
1 items
2028
$8M
2 items
2030
$15M
2 items
2031
$460K
1 items
2032 and later
$4M
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 4 | $25M | 52% |
| Water Supply | 4 | $15M | 32% |
| Water Distribution | 4 | $8M | 17% |
1 publicly owned treatment plant in Astoria with 14 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Astoria STP | 1.75 | OR0027561 | 14 |
Sources and methodology
Budgets and years are as published in Astoria’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2033 (12 line items).