Astoria, Oregon: water and wastewater capital improvement projects

12 line items · $49M · starting 2026–2031 · 1 plan

Astoria's published capital plans list 12 water, sewer and wastewater line items with a combined planning budget of $49M, of which 4 items worth $25M sit in the wastewater and sewer departments. The largest single item is Sanitary Sewer Pipe Interceptor Comprehensive Evaluation (including cleaning)and Replacement/Rehabilitation Project at $10M (2030–2034). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Astoria

The 10 largest water, sewer and wastewater line items in Astoria’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Sanitary Sewer Pipe Interceptor Comprehensive Evaluation (including cleaning)and Replacement/Rehabilitation ProjectWastewaterForce mains and interceptors$10M2030–2034
2WWTP Headworks Improvements ProjectWastewaterHeadworks, screening and grit$10M2023–2026
3Clearwell and Laboratory at the Water Treatment PlantWater SupplyWater treatment plants$6M2028
4Little Bear Creek Waterline Resilience ProjectWater SupplyStormwater and flood resilience$5M2030
5Bear Creek Dam Emergency Spillway ProjectWater Supply$4M2034
6Sewage Lift Stations Rehabilitation ProjectWastewaterLift stations$4M2025–2026
7Pipeline Road Waterline Resilience ProjectWater DistributionStormwater and flood resilience$3M2023–2026
816th St Distribution Waterline Replacement ProjectWater DistributionWater mains and distribution$3M2023–2026
9Irving Ave. (20th ‐ 28th St.) Waterline Resiliency ProjectWater DistributionStormwater and flood resilience$2M2026–2027
10Wastewater Collection System Assessment & Master PlanWastewaterSewer rehabilitation and I&I$2M2028

2 more line items in Astoria, with descriptions and contacts

Klarifi holds every Astoria line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$19M

4 items

2026

$2M

1 items

2027

$600K

1 items

2028

$8M

2 items

2030

$15M

2 items

2031

$460K

1 items

2032 and later

$4M

1 items

By department

Line items and planning budgets by department, Astoria.
DepartmentLine itemsBudgetShare
Wastewater4$25M52%
Water Supply4$15M32%
Water Distribution4$8M17%

Wastewater treatment plants in Astoria

1 publicly owned treatment plant in Astoria with 14 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Astoria STP1.75OR002756114

Other Oregon cities with capital plans

Astoria capital plan questions

Sources and methodology

Budgets and years are as published in Astoria’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2033 (12 line items).

Data refreshed September 11, 2026.