27 line items · $92M · starting 2026–2029 · 1 plan

Ashland's published capital plans list 27 water, sewer and wastewater line items with a combined planning budget of $92M, of which 11 items worth $13M sit in the wastewater and sewer departments. The largest single item is 7.0 MGD Water Treatment Plant at $52M (2024–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Ashland

The 10 largest water, sewer and wastewater line items in Ashland’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
17.0 MGD Water Treatment PlantWater SupplyWater treatment plants$52M2024–2026
27.0 MGD Water Treatment Plant Construction AdminstrationWater SupplyWater treatment plants$7M2024–2026
3Dam Safety ImprovementsWater SupplyStormwater and flood resilience$7M2024–2025
4Distribution Pipe ProjectsWater DistributionWater mains and distribution$5M2024–2029
5WWTP Process Improvements (Headworks)WastewaterHeadworks, screening and grit$4M2024–2025
6Upsize Bear Creek Intercceptor from Wightman Street to Tolman Creek RoadSewerForce mains and interceptors$2M2024–2028
7N Phoenix Road Pipe ImprovementsWater DistributionWater mains and distribution$2M2028–2029
8Annual Pipe ReplacementWater DistributionWater mains and distribution$2M2024–2029
924-inch Pipe Seismic Upgrades (Highway 99 Phoenix)Water DistributionWater mains and distribution$2M2025
10Hillview BPS ReplacementWater Distribution$2M2026–2027

17 more line items in Ashland, with descriptions and contacts

Klarifi holds every Ashland line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$86M

19 items

2026

$2M

2 items

2027

$75K

1 items

2028

$4M

4 items

2029

$671K

1 items

By department

Line items and planning budgets by department, Ashland.
DepartmentLine itemsBudgetShare
Wastewater6$8M8%
Sewer5$5M5%
Water Supply4$66M72%
Water Distribution12$13M14%

Project types in Ashland's plan

Wastewater treatment plants in Ashland

1 publicly owned treatment plant in Ashland with 15 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Ashland WWTP1.71OR002625515

Other Oregon cities with capital plans

Ashland capital plan questions

Sources and methodology

Budgets and years are as published in Ashland’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2024–2029 (27 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free