25 line items · $89M · starting 2026–2030 · 1 plan

Tigard's published capital plans list 25 water, sewer and wastewater line items with a combined planning budget of $89M, of which 6 items worth $4M sit in the wastewater and sewer departments. The largest single item is Pipeline Renewal and Replacement Program (PRRP) at $32M (2025–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Tigard

The 10 largest water, sewer and wastewater line items in Tigard’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Pipeline Renewal and Replacement Program (PRRP)Water SupplyWater mains and distribution$32M2025–2030
2East Pressure Zone Consolidation Project (Formerly Bull ain Water Pipeline)Water SupplyWater mains and distribution$17M2025–2028
3Water Meter ModernizationWater SupplyMeters and AMI$15M2025–2029
4Pump Station 8 RebuildWater SupplyPump stations$5M2026–2028
5Reservoir 19 - Phase 1Water SupplyStorage tanks and reservoirs$5M2025–2026
6Aquifer Storage and Recovery Well #2 and Well #3Water SupplyWells and groundwater$2M2025–2026
7Water Treatment Plant & RIPS GeneratorWater SupplyWater treatment plants$2M2025–2026
8Leron / Tigard Trunk Sewer ReplacementSewerForce mains and interceptors$1M2028–2029
9Water System Major Maintenance ProgramWater Distribution$1M2025–2030
10Lake Oswego/Tigard Water Supply ExpansionWater Supply$1M2026

15 more line items in Tigard, with descriptions and contacts

Klarifi holds every Tigard line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$79M

16 items

2026

$8M

7 items

2028

$1M

1 items

2030

$450K

1 items

By department

Line items and planning budgets by department, Tigard.
DepartmentLine itemsBudgetShare
Sewer6$4M5%
Water Supply17$83M94%
Water Distribution2$1M2%

Wastewater treatment plants in Tigard

1 publicly owned treatment plant in Tigard with 6 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Durham Waste Handling18.4ORL0281186

Other Oregon cities with capital plans

Tigard capital plan questions

Sources and methodology

Budgets and years are as published in Tigard’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2024–2030 (25 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free