25 line items · $89M · starting 2026–2030 · 1 plan
Tigard's published capital plans list 25 water, sewer and wastewater line items with a combined planning budget of $89M, of which 6 items worth $4M sit in the wastewater and sewer departments. The largest single item is Pipeline Renewal and Replacement Program (PRRP) at $32M (2025–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Pipeline Renewal and Replacement Program (PRRP) | Water Supply | Water mains and distribution | $32M | 2025–2030 |
| 2 | East Pressure Zone Consolidation Project (Formerly Bull ain Water Pipeline) | Water Supply | Water mains and distribution | $17M | 2025–2028 |
| 3 | Water Meter Modernization | Water Supply | Meters and AMI | $15M | 2025–2029 |
| 4 | Pump Station 8 Rebuild | Water Supply | Pump stations | $5M | 2026–2028 |
| 5 | Reservoir 19 - Phase 1 | Water Supply | Storage tanks and reservoirs | $5M | 2025–2026 |
| 6 | Aquifer Storage and Recovery Well #2 and Well #3 | Water Supply | Wells and groundwater | $2M | 2025–2026 |
| 7 | Water Treatment Plant & RIPS Generator | Water Supply | Water treatment plants | $2M | 2025–2026 |
| 8 | Leron / Tigard Trunk Sewer Replacement | Sewer | Force mains and interceptors | $1M | 2028–2029 |
| 9 | Water System Major Maintenance Program | Water Distribution | — | $1M | 2025–2030 |
| 10 | Lake Oswego/Tigard Water Supply Expansion | Water Supply | — | $1M | 2026 |
15 more line items in Tigard, with descriptions and contacts
Klarifi holds every Tigard line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$79M
16 items
2026
$8M
7 items
2028
$1M
1 items
2030
$450K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 6 | $4M | 5% |
| Water Supply | 17 | $83M | 94% |
| Water Distribution | 2 | $1M | 2% |
1 publicly owned treatment plant in Tigard with 6 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Durham Waste Handling | 18.4 | ORL028118 | 6 |
Sources and methodology
Budgets and years are as published in Tigard’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2030 (25 line items).
Data refreshed September 11, 2026.