Sussex, Wisconsin: water and wastewater capital improvement projects

9 line items · $21M · starting 2026–2030 · 1 plan

Sussex's published capital plans list 9 water, sewer and wastewater line items with a combined planning budget of $21M. The largest single item is Well 6&7 treatment plant upgrade at $5M (2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Sussex

The 9 largest water, sewer and wastewater line items in Sussex’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Well 6&7 treatment plant upgradeWater SupplyWastewater treatment plant upgrades$5M2028
2Spring Green, Pembrooke, Crestview & Parkview Road ImprovementsWater DistributionSewer rehabilitation and I&I$3M2027
3Eagles Ridge (Mill/Overlay) 5 milesWater DistributionSewer rehabilitation and I&I$3M2026
4Woodland Creek/Centennial Oaks Road ImprovementsWater DistributionSewer rehabilitation and I&I$3M2029
5Arterial Street ImprovementsWater DistributionSewer rehabilitation and I&I$2M2030
6Ammonia Treatment @ Well 5Water SupplyNutrient removal$2M2030
7Old Mill & Stonefield Road ImprovementsWater DistributionSewer rehabilitation and I&I$2M2030
8WWTF Repairs (Roof + Well 5, valves, aeration, gravity, sprinkler, repave)Water SupplyAeration and blowers$1M2025
9West Industrial Park Road ImprovementsWater DistributionSewer rehabilitation and I&I$750K2028

Descriptions, page references and contacts for Sussex

Klarifi holds every Sussex line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$1M

1 items

2026

$3M

1 items

2027

$3M

1 items

2028

$6M

2 items

2029

$3M

1 items

2030

$5M

3 items

By department

Line items and planning budgets by department, Sussex.
DepartmentLine itemsBudgetShare
Water Supply3$8M38%
Water Distribution6$13M62%

Wastewater treatment plants in Sussex

1 publicly owned treatment plant in Sussex with 3 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Sussex Wastewater Treatment Facility2.57WI00205593

Other Wisconsin cities with capital plans

Sussex capital plan questions

Sources and methodology

Budgets and years are as published in Sussex’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2021–2030 (9 line items).

Data refreshed September 11, 2026.