Klarifi Logo
Try for freeLog in
Klarifi Logo

Waukesha, Wisconsin: water and wastewater capital improvement projects

36 line items · $61M · starting 2026–2029 · 1 plan

Waukesha's published capital plans list 36 water, sewer and wastewater line items with a combined planning budget of $61M, of which 36 items worth $61M sit in the wastewater and sewer departments. The largest single item is Sanitary Sewer Rehabilitation at $19M (2025–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Waukesha

The 10 largest water, sewer and wastewater line items in Waukesha’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Sanitary Sewer RehabilitationSewerSewer rehabilitation and I&I$19M2025–2029
2Facility Plan 11-15 Yr UpgradesWastewaterBiosolids, sludge and dewatering$15M2025–2027
3Bio-Gas Purification for Reuse SystemWastewaterWater reuse and reclaimed water$5M2029
4Sanitary Pump Station & Force Main Rehab.SewerPump stations$5M2025–2029
5Bldgs. 110 & 140 Emergency Backup Generator Repl.WastewaterGenerators, power and electrical$5M2025
6Facility Plan 16-20 Yr UpgradesWastewaterBiosolids, sludge and dewatering$5M2027–2028
7Sanitary Manhole RehabilitationSewerSewer rehabilitation and I&I$2M2025–2029
8Sanitary Interceptor ProjectsSewerForce mains and interceptors$1M2025
9RAS Pipe ReplacementWastewaterWater mains and distribution$850K2029
10Lift Station Radio Communication Replacem.SewerLift stations$680K2027

26 more line items in Waukesha, with descriptions and contacts

Klarifi holds every Waukesha line item with its description, the page it appears on and the source document, plus 8 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$47M

16 items

2026

$739K

6 items

2027

$6M

5 items

2028

$745K

3 items

2029

$6M

6 items

By department

Line items and planning budgets by department, Waukesha.
DepartmentLine itemsBudgetShare
Wastewater28$33M54%
Sewer8$28M46%

Project types in Waukesha's plan

Wastewater treatment plants in Waukesha

1 publicly owned treatment plant in Waukesha with 3 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Waukesha Waste Water Treatment Plant3.15WI00299713

Other Wisconsin cities with capital plans

Waukesha capital plan questions

Sources and methodology

Budgets and years are as published in Waukesha’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2029 (36 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free