21 line items · $32M · starting 2026–2029 · 1 plan
Brookfield's published capital plans list 21 water, sewer and wastewater line items with a combined planning budget of $32M, of which 6 items worth $12M sit in the wastewater and sewer departments. The largest single item is Brookfield Square interceptor improvements at $7M (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Brookfield Square interceptor improvements | Wastewater | Force mains and interceptors | $7M | 2025 |
| 2 | Brentwood Subd. Water main | Water Distribution | Water mains and distribution | $4M | 2028 |
| 3 | Deer Creek basin sanitary sewer improvements | Wastewater | Sewer rehabilitation and I&I | $4M | 2027 |
| 4 | Replace failing water main | Water Distribution | Water mains and distribution | $3M | 2025–2026 |
| 5 | Sleepy Hollow subd. Water main | Water Distribution | Water mains and distribution | $3M | 2027 |
| 6 | Bluebrook subd. Water main | Water Distribution | Water mains and distribution | $3M | 2029 |
| 7 | Sherlyn subd. Water Main | Water Distribution | Water mains and distribution | $2M | 2026 |
| 8 | Mayfair Dr. and N. 128th St. Water main | Water Distribution | Water mains and distribution | $1M | 2026 |
| 9 | Water - meters | Water Supply | Meters and AMI | $1M | 2025–2029 |
| 10 | Indian Heights and Elmridge subds water main | Water Distribution | Water mains and distribution | $1M | 2025 |
11 more line items in Brookfield, with descriptions and contacts
Klarifi holds every Brookfield line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$16M
13 items
2026
$4M
3 items
2027
$7M
3 items
2028
$4M
1 items
2029
$3M
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 6 | $12M | 38% |
| Water Supply | 4 | $2M | 6% |
| Water Distribution | 11 | $18M | 56% |
1 publicly owned treatment plant in Brookfield with 10 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Fox River Water Pollution Control Center | 8.95 | WI0023469 | 10 |
Sources and methodology
Budgets and years are as published in Brookfield’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (21 line items).
Data refreshed September 11, 2026.