43 line items · $25M · starting 2026–2029 · 1 plan
Platteville's published capital plans list 43 water, sewer and wastewater line items with a combined planning budget of $25M, of which 21 items worth $15M sit in the wastewater and sewer departments. The largest single item is Anaerobic Digester Design at $4M (2026–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Anaerobic Digester Design | Wastewater | Anaerobic digesters and biogas | $4M | 2026–2029 |
| 2 | Motor Control Center replacements | Water Supply | Generators, power and electrical | $3M | 2025–2028 |
| 3 | RAS/WAS Pumps Design/Constructn | Wastewater | Pump stations | $3M | 2026–2029 |
| 4 | Influent Pumping Design-Construction | Sewer | — | $2M | 2025–2027 |
| 5 | Sludge Cake Building | Wastewater | Biosolids, sludge and dewatering | $1M | 2028–2029 |
| 6 | Trickling Filter Pumps Design/Const. | Wastewater | Membranes and filtration | $1M | 2028–2029 |
| 7 | Seventh Avenue: Camp to Ridge | Water Distribution | Sewer rehabilitation and I&I | $920K | 2025 |
| 8 | Knollwood Way Reconstruction | Water Distribution | Sewer rehabilitation and I&I | $770K | 2029 |
| 9 | Knollwood Way Reconstruction | Sewer | Sewer rehabilitation and I&I | $700K | 2029 |
| 10 | Sunset Drive Reconstruction Industry | Water Distribution | Sewer rehabilitation and I&I | $540K | 2027 |
33 more line items in Platteville, with descriptions and contacts
Klarifi holds every Platteville line item with its description, the page it appears on and the source document, plus 19 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$8M
12 items
2026
$9M
11 items
2027
$2M
7 items
2028
$4M
9 items
2029
$2M
4 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 5 | $9M | 38% |
| Sewer | 16 | $6M | 23% |
| Water Supply | 6 | $4M | 14% |
| Water Distribution | 16 | $6M | 25% |
1 publicly owned treatment plant in Platteville. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Platteville Wastewater Treatment Facility | 1.34 | WI0020435 | 0 |
Sources and methodology
Budgets and years are as published in Platteville’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (43 line items).
Data refreshed September 11, 2026.